Pelindaba

Technical specifications, photos, nearby jobs, and satellite map for Pelindaba.

Reactor Data

Research Reactors

?
Research and test reactors, critical assemblies and prototypes at this site, as listed in the IAEA Research Reactor Database: type, thermal power, first criticality, shutdown date, current status and what each is used for.
2 reactors: 1 operational, 1 decommissioned.
Reactor Type Thermal Power First Criticality Shutdown Status Used For
SAFARI-1 Tank In Pool 20 MWt 1965-03-18 Operational isotope production, neutron scattering, neutron radiography, transmutation, activation analysis, geochronology, teaching, training
Pelinduna-0 Crit Fast 1967-01-01 Decommissioned
Source: IAEA Research Reactor Database (RRDB), as of 2026-10-13.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
7 facilities: 1 in operation, 2 decommissioning, 3 shutdown, 1 others.
Facility Type Scale Design Capacity Operated Status Operator
Pelindaba Fuel Fabrication Fuel Fabrication (Research Reactors) Pilot plant 1 t HM/year 1978– In Operation Atomic Energy Corporation
Valindaba Y - Plant Uranium Enrichment Pilot plant 10 MTSWU/year 1978–1990 Decommissioning Atomic Energy Corporation
Valindaba (UF6) Conversion to UF6 Commercial 1400 t HM/year 1986–1997 Shutdown Uranium Enrichment Corporation
Valindaba Z - Plant Uranium Enrichment Commercial 300 MTSWU/year 1986–1995 Decommissioning Atomic Energy Corporation Of South Africa Ltd (AEC)
Beva Fuel Fabrication (U Pellet, Pin, FA) Commercial 100 t HM/year 1988–1996 Shutdown Atomic Energy Corporation Of South Africa Ltd (AEC)
Pelindaba Zircaloy Tubing Zirconium Alloy Tubing Commercial 0 km/year 1988–1993 Shutdown Atomic Energy Corporation Of South Africa Ltd (AEC)
Valindaba (Laser) Uranium Enrichment Pilot plant 30 MTSWU/year 1995–1998 Others Atomic Energy Corporation
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$109
Lodging/Night
$61
M&IE/Day
$170
Total/Day
South Africa: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Meerhof, North West, South Africa
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Pelindaba; Wikipedia: SAFARI-1; GlobalSecurity: Valindaba / Pelindaba East.

Pelindaba is South Africa's main nuclear research center, about 33 km west of Pretoria, southeast of the Hartbeespoort Dam in North West Province. It was developed by the Atomic Energy Board, which took on the country's nuclear research and development work in 1959.

Read more

The SAFARI-1 research reactor was built from 1961 to 1965 under the United States Atoms for Peace program, and first reached criticality on March 18, 1965. Beside the center, the Y-plant (also called Valindaba) was a uranium enrichment plant. Pilot plant construction began in 1971 and the plant was shut in 1990.