Regodola
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$246
Lodging/Night
$146
M&IE/Day
$392
Total/Day
Spain: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
43.6719, -7.37821
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Boletín Oficial del Estado, 23 August 1976; Global Energy Monitor: Regodola.
Regodola was a planned nuclear power plant at Regodola cove in Xove, on the coast of Lugo province in Galicia. A consortium led by the utility FENOSA applied in 1973 to build a single light-water reactor of about 1,000 MWe.
Read more
The plant was never built. The project was cancelled around 1980, before Spain's 1984 nuclear moratorium stopped the rest of the country's nuclear expansion program.
Never built: project cancelled