San Onofre 1

DECON

Southern California Edison·San Clemente, CA·PWR·436 MWe

Community ratings, technical specifications, photos, nearby jobs, satellite map, contact information, and per diem rates for San Onofre 1.

DECON

Permanently shut down on 1992-11-30.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
1 unit: 1 permanent shutdown.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
San Onofre 1 PWR PWR 436 1964-05-01 1967-07-16 1968-01-01 1992-11-30 Permanent Shutdown
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
San Onofre 1 436 456 1,347 1967-06-14 WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
San Onofre 1 51.1 TWh 53.2% 59.8% 55.1%
Operator: SOUTHERN CALIFORNIA EDISON Co.
Owner: SOUTHERN CALIFORNIA EDISON Co.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-26.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$199
Lodging/Night
$86
M&IE/Day
$285
Total/Day
Los Angeles, Los Angeles / Orange / Ventura / Edwards AFB less the city of Santa Monica County, CA

Unemployment Benefits CA

?
Maximum state unemployment insurance benefits for CA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$450
Max Weekly
26
Max Weeks
$11,700
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
5000 Pacific Coast Highway
San Clemente, CA 92673, USA
Get Directions
Phone: (714) 302-1212

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: San Onofre Nuclear Generating Station.

San Onofre Nuclear Generating Station stands on the Pacific coast in San Diego County, California, just south of San Clemente, on land within Marine Corps Base Camp Pendleton.

Read more

Unit 1, a Westinghouse pressurized water reactor, began construction in August 1964, entered commercial operation on January 1, 1968, and was shut down on November 30, 1992. Units 2 and 3 are Combustion Engineering two-loop pressurized water reactors that entered commercial operation on August 8, 1983, and April 1, 1984. In January 2012 both units went offline after premature wear was found in replacement steam generators installed in 2010 and 2011, and Unit 3 had a radioactive leak on January 31, 2012. Southern California Edison announced the permanent retirement of Units 2 and 3 in June 2013.

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
EIX Edison International NYSE
$57.62 ▲ +0.27 (+0.47%)
Previous Close 57.35
Day's Range 57.06 – 58.00
52-Week Range 51.10 – 81.62
Volume 1,750,016
Delayed quote as of Oct 26, 2026 3:51 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
NSS Supplier: Westinghouse
Net Capacity: 436 MWe
Status: DECON

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Const. Permit: 1964-05-01
Operating Lic: 1967-07-16
Commercial Op: 1968-01-01