Shin-Kori
Reactor Data
Reactor Units
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 2 operational.
Net capacity in service: 1,968 MWe.
| Unit | Type | Model | Net MWe | Construction | Grid | Commercial Op | Shutdown | Status |
|---|---|---|---|---|---|---|---|---|
| Shin-Kori 1 | PWR | OPR-1000 | 986 | 2006-06-16 | 2010-08-04 | 2011-02-28 | Operational | |
| Shin-Kori 2 | PWR | OPR-1000 | 982 | 2007-06-05 | 2012-01-28 | 2012-07-20 | Operational |
Capacity, milestones and suppliers
| Unit | Design MWe | Gross MWe | Thermal MWt | First Criticality | Reactor Supplier | Turbine Supplier | Notes |
|---|---|---|---|---|---|---|---|
| Shin-Kori 1 | 998 | 1,038 | 2,825 | 2010-07-15 | DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING | Doosan Heavy Industries & Construction and General Electric | |
| Shin-Kori 2 | 995 | 1,036 | 2,825 | 2011-12-27 | DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING | Doosan Heavy Industries & Construction and General Electric |
Lifetime performance, through 2025
| Unit | Electricity Supplied | Load Factor | Energy Availability | Operating Factor |
|---|---|---|---|---|
| Shin-Kori 1 | 101.9 TWh | 77.5% | 78.2% | 78.0% |
| Shin-Kori 2 | 100.9 TWh | 84.7% | 84.6% | 85.5% |
Operator: Korea Hydro and Nuclear Power Co.
Owner: Korea Hydro and Nuclear Power Co.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-11-02.
Working Here
Per Diem Rates FY 2026
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$60
Lodging/Night
$40
M&IE/Day
$100
Total/Day
South Korea: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.
Photos
Photos of this facility from the NukeWorker photo gallery. Click the header or any photo to browse the full album.
Facility Map
Interactive satellite map showing the facility's geographic location. Marker color indicates current status: green for online, red for offline, orange for reduced power. Click the header to open in Google Maps satellite view.
35.3291, 129.302
Location & Contact
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Plant Facts
About This Site
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: WNA: Shin Kori 1; WNA: Shin Kori 2.
Shin-Kori Nuclear Power Plant is the site of two Korean OPR-1000 pressurized water reactors in the Gijang area of Busan, South Korea, beside the older Kori plant.
Read more
Construction of Unit 1 began on 16 June 2006 and Unit 2 on 5 June 2007. Unit 1 reached first criticality on 15 July 2010, was connected to the grid on 4 August 2010 and entered commercial operation on 28 February 2011. Unit 2 reached criticality on 27 December 2011, was connected to the grid on 28 January 2012 and entered commercial operation on 20 July 2012.