Tianwan

Technical specifications, photos, nearby jobs, and satellite map for Tianwan.

Working Here

Per Diem Data

?
GSA per diem rates for the area near this facility. Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel. Links open the official GSA rate lookup.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
,
Get Directions

Plant Facts

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
8 units: 6 operational, 2 under construction. Net capacity in service: 6,240 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Tianwan 1 PWR VVER V-428 1,000 1999-10-20 2006-05-12 2007-05-17 Operational
Tianwan 2 PWR VVER V-428 1,000 2000-09-20 2007-05-14 2007-08-16 Operational
Tianwan 3 PWR VVER V-428M 1,060 2012-12-27 2017-12-30 2018-02-14 Operational
Tianwan 4 PWR VVER V-428M 1,060 2013-09-27 2018-10-27 2018-12-22 Operational
Tianwan 5 PWR CNP-1000 1,060 2015-12-27 2020-08-08 2020-09-08 Operational
Tianwan 6 PWR CNP-1000 1,060 2016-09-07 2021-05-11 2021-06-02 Operational
Tianwan 7 PWR VVER-1200/V491 1,171 2021-05-19 Under Construction
Tianwan 8 PWR VVER-1200/V491 1,171 2022-02-25 Under Construction
Operator: Jiangsu Nuclear Power Corporation
Owner: Jiangsu Nuclear Power Corporation; CHINA NATIONAL NUCLEAR CORPORATION
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-12.