Tokai mura

Technical specifications, photos, nearby jobs, and satellite map for Tokai mura.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
2 units: 1 suspended operation, 1 permanent shutdown. Net capacity in service: 1,060 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Tokai 1 GCR MAGNOX 137 1961-03-01 1965-11-10 1966-07-25 1998-03-31 Permanent Shutdown
Tokai 2 BWR BWR-5 1,060 1973-10-03 1978-03-13 1978-11-28 Suspended Operation
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Tokai 1 159 166 587 1965-05-04 GENERAL ELECTRIC COMPANY (UK) GENERAL ELECTRIC COMPANY (UK)
Tokai 2 1,056 1,100 3,293 1978-01-18 GENERAL ELECTRIC CO. GENERAL ELECTRIC CO./ HITACHI, LTD. Suspended 2011-03-11
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Tokai 1 28.2 TWh 70.8% 75.7% 78.7%
Tokai 2 221.6 TWh 72.9% 72.6% 73.5%
Operator: JAPAN ATOMIC POWER CO.
Owner: JAPAN ATOMIC POWER CO.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-14.

Research Reactors

?
Research and test reactors, critical assemblies and prototypes at this site, as listed in the IAEA Research Reactor Database: type, thermal power, first criticality, shutdown date, current status and what each is used for.
13 reactors: 3 operational, 5 decommissioned, 5 under decommissioning.
Reactor Type Thermal Power First Criticality Shutdown Status Used For
NSRR Triga Acpr 3 kWt 1975-06-30 Operational materials testing
JRR-3M Pool 20 MWt 1990-03-22 Operational isotope production, neutron scattering, neutron radiography, materials testing, transmutation, activation analysis, geochronology
STACY Crit Assembly 200 Wt 1995-02-23 Operational nuclear data
JRR-1 Homog (l) 6 kWt 1957-08-27 Decommissioned
JRR-2 Tank 10 MWt 1960-10-01 Under decommissioning
AHCF Crit Assembly 10 Wt 1961-01-01 Decommissioned
JRR-3 Heavy Water 10 MWt 1962-01-01 Decommissioned
TCA Tank Critical Assembly Crit Assembly 200 Wt 1962-08-23 2010-11-08 Under decommissioning teaching, training
JRR-4 Pool 3.5 MWt 1965-01-28 Under decommissioning isotope production, materials testing, transmutation, activation analysis, geochronology, neutron capture therapy, training
SCA Crit Assembly 200 Wt 1966-08-01 Decommissioned
FCA Crit Fast 2 kWt 1967-04-29 2011-03-10 Under decommissioning teaching, training
VHTRC Crit Assembly 10 Wt 1985-05-13 Decommissioned
TRACY Pulsing 1 kWt 1995-12-20 2011-03-08 Under decommissioning
Source: IAEA Research Reactor Database (RRDB), as of 2026-10-13.

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
15 facilities: 6 in operation, 6 decommissioning, 2 shutdown, 1 decommissioned.
Facility Type Scale Design Capacity Operated Status Operator
JAEA Tokai Plutonium Fuel Development Facility (Pu-1 - MOX) MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Laboratory 0.3 t HM/year 1965– In Operation Japan Atomic Energy Agency (JAEA)
MNF-Fuel Fabrication Facility Fuel Fabrication (U Pellet, Pin, FA) Commercial 440 t U/year 1972– In Operation Mitsubishi Nuclear Fuel (MNF)
MNF-Reconversion facility Re-conversion to UO2 Powder Commercial 450 t U/year 1972– In Operation Mitsubishi Nuclear Fuel (MNF)
NFI Tokai Works Fuel Fabrication (U Pellet, Pin, FA) Commercial 250 t U/year 1980– In Operation Nuclear Fuel Industries Ltd (NFI)
JAEA Tokai Plutonium Fuel Production Facility (Pu-3 - FBR) MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Pilot plant 10 t HM/year 1988– In Operation Japan Atomic Energy Agency (JAEA)
Tokai II NPP Site SFSF AFR Dry Spent Fuel Storage Commercial 3714 Cask-Bund. 2001– In Operation The Japan Atomic Power Company
JAEA Tokai Reprocessing Test Facility (JRTF) Spent Fuel Reprocessing - aqueous route Laboratory 0 t HM/year 1968–1970 Decommissioning Japan Atomic Energy Agency (JAEA)
JAEA Tokai Plutonium Fuel Fabrication Facility (Pu-2 - ATR) MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Pilot plant 10 t HM/year 1972–2001 Decommissioning Japan Atomic Energy Agency (JAEA)
JAEA Tokai Plutonium Fuel Fabrication Facility (Pu-2 - FBR) MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Pilot plant 1 t HM/year 1972–2001 Decommissioning Japan Atomic Energy Agency (JAEA)
JAEA Tokai Reprocessing Plant - Spent Fuel Storage AFR Wet Spent Fuel Storage (Pool) Pilot plant 140 t HM 1977–2018 Decommissioning Japan Atomic Energy Agency (JAEA)
JAEA Tokai Reprocessing Plant (TRP) Spent Fuel Reprocessing - aqueous route Pilot plant 90 t U/year 1977–2006 Decommissioning Japan Atomic Energy Agency (JAEA)
Japan Nuclear Fuel Conversion (JCO) Re-conversion to UO2 Powder Commercial 718 t HM/year 1981–1999 Shutdown Japan Nuclear Fuel Conv. Co
JAEA Tokai Reprocessing Plant - Plutonium Conversion Development Facility (PCDF) MOX fuel fabrication (Mox Powder, Pellet, Pin, FA) Pilot plant 0.01 t HM/day 1983–2016 Decommissioning Japan Atomic Energy Agency (JAEA)
Tokai Test Facility Uranium Enrichment Laboratory 0 MTSWU/year 1987–2003 Decommissioned Laser Atomic Separation Eng. Research Association of Japan
JAEA Tokai Uranium Enrichment Facilities (Building L) Uranium Enrichment Laboratory 0 MTSWU/year 1990–2002 Shutdown Japan Atomic Energy Agency (JAEA)
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$208
Lodging/Night
$107
M&IE/Day
$315
Total/Day
Japan: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Tōkai, Ibaraki Prefecture, Japan
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Tokai Nuclear Power Plant.

Tokai is a village in Ibaraki Prefecture, Japan, on the Pacific coast, that hosts the Tokai Nuclear Power Plant along with a cluster of research reactors and nuclear fuel facilities.

Read more

Tokai Unit 1, a British-designed gas-cooled Magnox reactor, began construction on 1 March 1961, reached the grid on 10 November 1965 and entered commercial operation on 25 July 1966. It ceased operating on 31 March 1998. Tokai Unit 2, a General Electric boiling water reactor, began construction on 3 October 1973, reached the grid on 13 March 1978 and entered commercial operation on 28 November 1978. A criticality accident at a fuel facility in Tokai on 30 September 1999 killed two workers.