Ulchin

Technical specifications, photos, nearby jobs, and satellite map for Ulchin.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
6 units: 6 operational. Net capacity in service: 5,871 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Hanul 1 PWR France CPI 953 1983-01-26 1988-04-07 1988-09-10 Operational
Hanul 2 PWR France CPI 957 1983-07-05 1989-04-14 1989-09-30 Operational
Hanul 3 PWR OPR-1000 991 1993-07-21 1998-01-06 1998-08-11 Operational
Hanul 4 PWR OPR-1000 994 1993-11-01 1998-12-28 1999-12-31 Operational
Hanul 5 PWR OPR-1000 989 1999-10-01 2003-12-18 2004-07-29 Operational
Hanul 6 PWR OPR-1000 987 2000-09-29 2005-01-07 2005-04-22 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Hanul 1 903 1,014 2,775 1988-02-25 FRAMATOME ALSTOM
Hanul 2 903 1,011 2,775 1989-02-25 FRAMATOME ALSTOM
Hanul 3 950 1,051 2,825 1997-12-21 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Hanul 4 950 1,052 2,825 1998-12-14 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Hanul 5 950 1,049 2,825 2003-11-28 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Hanul 6 950 1,049 2,825 2004-12-16 DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO.LTD./KOREA POWER ENGINEERING COMPANY/COMBUSTIONENGINEERING Doosan Heavy Industries & Construction and General Electric
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Hanul 1 264.8 TWh 85.9% 85.6% 86.1%
Hanul 2 261.6 TWh 87.4% 86.6% 87.4%
Hanul 3 205.8 TWh 85.4% 85.5% 86.2%
Hanul 4 192.1 TWh 82.1% 81.4% 82.5%
Hanul 5 165.3 TWh 88.0% 88.0% 88.3%
Hanul 6 160.8 TWh 88.5% 88.4% 88.9%
Operator: Korea Hydro and Nuclear Power Co.
Owner: Korea Hydro and Nuclear Power Co.
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$60
Lodging/Night
$40
M&IE/Day
$100
Total/Day
South Korea: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Buk-myeon, North Gyeongsang, South Korea
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Hanul Nuclear Power Plant.

Hanul Nuclear Power Plant, known until 2013 as Uljin (Ulchin), is in Buk-myeon, Uljin County, North Gyeongsang Province, South Korea, on the East Sea coast.

Read more

Construction of Unit 1 began on 26 January 1983 and Unit 2 on 5 July 1983, both French-designed pressurized water reactors. Units 3 to 6 are Korean OPR-1000 reactors, with construction starting in July 1993, November 1993, October 1999 and September 2000. The six units were connected to the grid on 7 April 1988, 14 April 1989, 6 January 1998, 28 December 1998, 18 December 2003 and 7 January 2005.