Westinghouse Columbia

Hopkins, SC

Technical specifications, photos, nearby jobs, satellite map, and per diem rates for Westinghouse Columbia.

Facility Data

Fuel Cycle Facilities

?
Fuel cycle plants at this site, as listed in the IAEA Nuclear Fuel Cycle Facilities Database: what each plant does, its scale and design capacity, the years it operated, its current status and who operates it.
1 facility: 1 in operation.
Facility Type Scale Design Capacity Operated Status Operator
Columbia Fuel Fabrication Facility Fuel Fabrication (U Pellet, Pin, FA) Commercial 1350 t U/year 1969– In Operation Westinghouse Electric Corporation
Source: IAEA Nuclear Fuel Cycle Facilities Database (NFCFDB), as of 2026-10-13.

Working Here

Per Diem Rates FY 2027

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2027.
$115
Lodging/Night
$74
M&IE/Day
$189
Total/Day
Columbia, Richland / Lexington County, SC

Unemployment Benefits SC

?
Maximum state unemployment insurance benefits for SC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$326
Max Weekly
20
Max Weeks
$6,520
Max Total
7-day waiting period before benefits begin

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Hopkins, SC 29061, USA
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Westinghouse: Columbia Fuel Fabrication Facility; Westinghouse: Columbia FFF FAQs; South Carolina DES: Westinghouse public meeting (2019).

The Columbia Fuel Fabrication Facility is a nuclear fuel plant on Bluff Road in Hopkins, in Richland County, South Carolina, just outside the state capital of Columbia. It converts uranium hexafluoride to uranium dioxide by the ammonium diuranate process and makes fuel for commercial nuclear power reactors.

Read more

Westinghouse opened the facility in 1969, although another Westinghouse page gives 1968 as the year it launched. The U.S. Atomic Energy Commission issued the first license in 1969. In 2011 a breach was found in the contaminated wastewater line, and the underground piping system was later abandoned and replaced with new surface piping.