Zaporozhye

Technical specifications, photos, nearby jobs, and satellite map for Zaporozhye.

Reactor Data

Reactor Units

?
Every power reactor at this site as listed in the IAEA Power Reactor Information System (PRIS): reactor type and model, net electrical capacity, grid connection and commercial operation dates, and current status.
6 units: 6 operational. Net capacity in service: 5,700 MWe.
Unit Type Model Net MWe Construction Grid Commercial Op Shutdown Status
Zaporizhzhia 1 PWR VVER V-320 950 1980-04-01 1984-12-10 1985-12-25 Operational
Zaporizhzhia 2 PWR VVER V-320 950 1981-01-01 1985-07-22 1986-02-15 Operational
Zaporizhzhia 3 PWR VVER V-320 950 1982-04-01 1986-12-10 1987-03-05 Operational
Zaporizhzhia 4 PWR VVER V-320 950 1983-04-01 1987-12-18 1988-04-14 Operational
Zaporizhzhia 5 PWR VVER V-320 950 1985-11-01 1989-08-14 1989-10-27 Operational
Zaporizhzhia 6 PWR VVER V-320 950 1986-06-01 1995-10-19 1996-09-17 Operational
Capacity, milestones and suppliers
Unit Design MWe Gross MWe Thermal MWt First Criticality Reactor Supplier Turbine Supplier Notes
Zaporizhzhia 1 950 1,000 3,000 1984-12-07 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 2 950 1,000 3,000 1985-06-28 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 3 950 1,000 3,000 1986-12-04 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 4 950 1,000 3,000 1987-12-15 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 5 950 1,000 3,000 1989-07-20 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Zaporizhzhia 6 950 1,000 3,000 1995-10-06 PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA Kharkiv Turbine Plant "Turboatom"
Lifetime performance, through 2025
Unit Electricity Supplied Load Factor Energy Availability Operating Factor
Zaporizhzhia 1 195.1 TWh 65.2% 66.7% 71.1%
Zaporizhzhia 2 195.0 TWh 66.2% 68.5% 72.6%
Zaporizhzhia 3 197.3 TWh 69.6% 71.3% 76.5%
Zaporizhzhia 4 196.2 TWh 71.4% 72.9% 76.3%
Zaporizhzhia 5 187.3 TWh 71.8% 73.4% 77.0%
Zaporizhzhia 6 164.5 TWh 77.8% 78.6% 80.5%
Operator: State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Owner: State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Source: IAEA Power Reactor Information System (PRIS), as of 2026-10-19.

Working Here

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from the U.S. State Department foreign per diem tables for FY 2026.
$140
Lodging/Night
$97
M&IE/Day
$237
Total/Day
Ukraine: rate for locations the State Department does not list separately
U.S. Department of State foreign per diem, for U.S. government and contractor travel.

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
Enerhodar, Zaporizhia Oblast, Ukraine
Get Directions

Plant Facts

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Zaporizhzhia Nuclear Power Plant; IAEA PRIS: Ukraine.

The Zaporizhzhia nuclear power plant is at Enerhodar in Zaporizhzhia Oblast, Ukraine, on the Dnieper River. It has six VVER-1000 pressurized water reactors.

Read more

Construction of Unit 1 began on April 1, 1980, with Units 2 to 4 starting between 1981 and 1983, and Units 5 and 6 in November 1985 and June 1986. The units were connected to the grid on December 10, 1984 (Unit 1), July 22, 1985 (Unit 2), December 10, 1986 (Unit 3), December 18, 1987 (Unit 4), August 14, 1989 (Unit 5), and October 19, 1995 (Unit 6). Russian forces seized the plant on March 4, 2022.