Breaker-to-Breaker Runs
6 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Arkansas Nuclear 1 has logged 6 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 538 days, and its runs average 506 days.
538
Best Run (days)
1R22 (2010-04-27) → 1R23 (2011-10-17)
★ Triple breaker-to-breaker
1R18 → 1R19 → 1R20 → 1R21
All Runs
| 2013-08-17 |
2015-01-26 |
527 days |
1R24 → 1R25 |
| 2011-11-21 |
2013-03-25 |
490 days |
1R23 → 1R24 |
| 2010-04-27 |
2011-10-17 |
538 days |
1R22 → 1R23 |
| 2007-05-14 |
2008-10-27 |
532 days |
1R20 → 1R21 |
| 2005-12-30 |
2007-04-23 |
479 days |
1R19 → 1R20 |
| 2004-06-20 |
2005-10-05 |
472 days |
1R18 → 1R19 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Arkansas Nuclear One.
Arkansas Nuclear One is a two-unit nuclear power station in Pope County, Arkansas, near Russellville, on the northeast shore of Lake Dardanelle.
Read more
Construction began on Unit 1 on October 1, 1968, and on Unit 2 on December 6, 1968. Unit 1, a Babcock & Wilcox pressurized water reactor, was first connected to the grid on August 17, 1974, and entered commercial operation that December. Unit 2, supplied by Combustion Engineering, was connected on December 26, 1978. On March 31, 2013, a generator stator fell during a replacement operation at Unit 1, killing one worker and cutting power to Unit 1 and part of Unit 2.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Arkansas Nuclear 1 has operated for about 51.9 years and averaged a 88.6% lifetime capacity factor, generating roughly 182.1 TWh of electricity. Its longest unbroken run reached 573 days.
Lifecycle & Tenure
Operating Age: 51.9 Yrs
Build Time: 6 Yrs
Lic. Remaining: 7.5 Yrs
Production & Power
Lifetime CF: 88.6%
Efficiency: 32.4%
Generated: 182.1 TWh
Reliability & Outages
Record Run: 573 Days
Refuelings: 18
Avg Startup: 7.3 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
ETR
Entergy Corporation
NYSE
$111.71
▼ -0.09 (-0.08%)
Previous Close
111.79
Day's Range
110.31 – 111.76
52-Week Range
90.87 – 118.45
Volume
1,304,179
Operational Excellence Score Subscribers
Arkansas Nuclear 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
9 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Arkansas Nuclear 1 has recorded 9 reactor scrams, or emergency shutdowns, since 2011 (5 automatic, 4 manual). On average the unit was back to full power about 14.7 days after each trip.
Recent Events
| 2025-09-24 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2023-02-14 |
Auto |
EN Revision Imported Date: 2/15/2023 EN Revision Text: AUTOM... |
|
| 2021-11-29 |
Auto |
EN Revision Imported Date: 12/29/2021 EN Revision Text: AUTO... |
|
| 2021-03-14 |
Manual |
EN Revision Imported Date: 4/13/2021 EN Revision Text: MANUA... |
|
| 2018-12-18 |
Auto |
AUTOMATIC REACTOR TRIP - LOSS OF NON-VITAL BUS"On December 1... |
|
| 2018-06-16 |
Manual |
MANUAL REACTOR TRIP DURING STARTUP "At 1121 CDT on June 16, ... |
|
| 2018-05-16 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO LOSS OF MAIN FEEDWATER PUMP"At... |
|
| 2017-04-26 |
Manual |
UNIT 1 AUTOMATIC REACTOR SCRAM DUE TO PARTIAL LOSS OF OFFSIT... |
|
+1 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
2568 MWt
Net Capacity:
833 MWe
Gross Capacity:
903 MWe IAEA
Design Capacity:
850 MWe IAEA
Efficiency:
32.4%
Lifetime Output:
296.2 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000313
License #:
DPR-51
License Type:
OL-FP
Const. Permit:
1968-12-06
Construction Start:
1968-10-01 IAEA
Operating Lic:
1974-05-21
First Criticality:
1974-08-06 IAEA
Grid Connection:
1974-08-17 IAEA
Commercial Op:
1974-12-19
License Renewed:
2001-06-20
License Exp:
2034-05-20
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
WSC
— West South Central
Balancing Authority:
MISO
— Midcontinent Independent System Operator (ISO/RTO)
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)