Reactor Status Timeline
Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri), the current state, and what is coming: the utility's published Scheduled outage plus, for subscribers, NukeWorker's model Projection. Colored by status. How far ahead you can see depends on your plan.Fuel Burn Down Cycle since Oct 23, 2025
NukeWorker's Operational Excellence Score 5-yr composite · ranks 17 of 93 ↑6
Operational
Excellence Score
Braidwood 1 ranks #17 of 93 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Refuel Duration (98th percentile). Weakest: Scrams (5-year) (47th percentile).
Per-dimension breakdown (7 metrics)
Each dimension's percentile is computed across the active US fleet (93 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →
Methodology
NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.
How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 93 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.
Active window — 5-year:
- Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
- Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
- Discipline — robust mean startup duration, scrams/yr (5yr, annualised)
Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.
What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.
Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.
Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.
Refresh cadence: recomputed daily. Each window cached separately.
A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.
Capacity Factor (365-Day)
Breaker-to-Breaker Runs 13 runs
| 2022-10-21 | 2024-04-15 | 542 days |
| 2021-06-22 | 2022-10-03 | 468 days |
| 2019-10-23 | 2021-04-05 | 530 days |
| 2018-06-06 | 2019-10-07 | 488 days |
| 2016-10-25 | 2018-04-09 | 531 days |
| 2015-04-18 | 2016-09-26 | 527 days |
| 2013-10-01 | 2015-03-30 | 545 days |
| 2012-05-20 | 2013-09-09 | 477 days |
| 2010-11-06 | 2012-04-16 | 527 days |
| 2007-10-26 | 2009-03-30 | 521 days |
| 2003-05-02 | 2004-10-05 | 522 days |
| 2001-10-12 | 2003-04-15 | 550 days |
| 2000-04-06 | 2001-09-22 | 534 days |
Scram History 6 events since 2011
Outage Duration Trend
?Power History (12-Month)
?Outage Days by Year
?Facility Statistics
NukeWorker Member Ratings 36 votes
Facility Map
41.2434, -88.2297
