Fuel Burn Down Cycle since Oct 23, 2025
NukeWorker's Operational Excellence Score 5-yr composite · ranks 19 of 94 →
Operational
Excellence Score
Braidwood 1 ranks #19 of 94 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Refuel Duration (97th percentile). Weakest: Scrams (5-year) (30th percentile).
Per-dimension breakdown (7 metrics)
Each dimension's percentile is computed across the active US fleet (94 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →
Methodology
NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.
How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 94 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.
Active window — 5-year:
- Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
- Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
- Discipline — robust mean startup duration, scrams/yr (5yr, annualised)
Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.
What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.
Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.
Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.
Refresh cadence: recomputed daily. Each window cached separately.
A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.
Capacity Factor (365-Day)
Breaker-to-Breaker Runs 13 runs
| 2022-10-21 | 2024-04-15 | 542 days |
| 2021-06-22 | 2022-10-03 | 468 days |
| 2019-10-23 | 2021-04-05 | 530 days |
| 2018-06-06 | 2019-10-07 | 488 days |
| 2016-10-25 | 2018-04-09 | 531 days |
| 2015-04-18 | 2016-09-26 | 527 days |
| 2013-10-01 | 2015-03-30 | 545 days |
| 2012-05-20 | 2013-09-09 | 477 days |
| 2010-11-06 | 2012-04-16 | 527 days |
| 2007-10-26 | 2009-03-30 | 521 days |
| 2003-05-02 | 2004-10-05 | 522 days |
| 2001-10-12 | 2003-04-15 | 550 days |
| 2000-04-06 | 2001-09-22 | 534 days |
Scram History 6 events since 2011
Outage Duration Trend
?Power History (12-Month)
?Outage Days by Year
?Facility Statistics
NukeWorker Member Ratings 36 votes
Facility Map
41.2434, -88.2297
