ELITE B2B CHAMPION
5+ RUNS CLEAN
4,252 days without a trip
·
14 Career Runs · 7 since last trip
Champion since Jan 4, 2017
Breaker-to-Breaker Runs
14 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Byron 1 has logged 14 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 535 days, and its runs average 521 days.
535
Best Run (days)
B1R23 (2020-03-27) → B1R24 (2021-09-13)
★ 7-run breaker-to-breaker
B1R20 → B1R21 → B1R22 → B1R23 → B1R24 → B1R25 → B1R26 → B1R27
All Runs
| 2024-09-30 |
2026-03-02 |
518 days |
B1R26 → B1R27 |
| 2023-03-25 |
2024-09-09 |
534 days |
B1R25 → B1R26 |
| 2021-10-01 |
2023-03-06 |
521 days |
B1R24 → B1R25 |
| 2020-03-27 |
2021-09-13 |
535 days |
B1R23 → B1R24 |
| 2018-09-25 |
2020-03-09 |
531 days |
B1R22 → B1R23 |
| 2017-03-27 |
2018-09-10 |
532 days |
B1R21 → B1R22 |
| 2015-10-03 |
2017-02-27 |
513 days |
B1R20 → B1R21 |
| 2012-10-08 |
2014-03-10 |
518 days |
B1R18 → B1R19 |
| 2009-10-09 |
2011-03-14 |
521 days |
B1R16 → B1R17 |
| 2008-04-15 |
2009-09-14 |
517 days |
B1R15 → B1R16 |
| 2005-03-26 |
2006-09-11 |
534 days |
B1R13 → B1R14 |
| 2003-10-14 |
2005-02-28 |
503 days |
B1R12 → B1R13 |
| 2000-10-11 |
2002-03-12 |
517 days |
B1R10 → B1R11 |
| 1999-05-18 |
2000-09-23 |
494 days |
B1R9 → B1R10 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Byron Nuclear Generating Station.
Byron Station is a two-unit nuclear plant in Rockvale Township, Ogle County, Illinois, near the town of Byron and about two miles east of the Rock River. It lies about 17 miles southwest of Rockford.
Read more
Commonwealth Edison began construction on April 1, 1975, and built two Westinghouse four-loop pressurized water reactors. In 1984 a licensing board refused permission to start operation over contractor quality-control concerns, then reversed itself in October 1984. Unit 1 received its operating license on February 14, 1985, was connected to the grid on March 1, 1985, and entered commercial service on September 16, 1985. Unit 2 was licensed on January 30, 1987, connected on February 6, 1987, and entered commercial operation on August 2, 1987. Elevated groundwater tritium was reported in 2006.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Byron 1 has operated for about 41.1 years and averaged a 94.3% lifetime capacity factor, generating roughly 270.2 TWh of electricity. Its longest unbroken run reached 543 days.
Lifecycle & Tenure
Operating Age: 41.1 Yrs
Build Time: 9.7 Yrs
Lic. Remaining: 18 Yrs
Production & Power
Lifetime CF: 94.3%
Efficiency: 31.9%
Generated: 270.2 TWh
Reliability & Outages
Record Run: 543 Days
Refuelings: 19
Avg Startup: 4.1 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Oct 20, 2000 |
Merger |
Commonwealth Edison (Unicom) |
Exelon |
| Feb 1, 2022 |
Spin-off |
Exelon |
Constellation Energy |
CEG
Constellation Energy Corporation
NasdaqGS
$258.08
▼ -0.90 (-0.35%)
Previous Close
258.98
Day's Range
254.45 – 261.88
52-Week Range
228.63 – 406.04
Volume
2,392,730
Operational Excellence Score Subscribers
Byron 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
1 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Byron 1 has recorded 1 reactor scram, or emergency shutdown, since 2011 (1 automatic, 0 manual). On average the unit was back to full power about 8 days after each trip.
Recent Events
| 2015-03-03 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO MAIN POWER TRANSFORMER BUSHING... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
3645 MWt
Net Capacity:
1164 MWe
Gross Capacity:
1,242 MWe IAEA
Design Capacity:
1,120 MWe IAEA
Efficiency:
31.9%
Lifetime Output:
359.8 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000454
License #:
NPF-37
License Type:
OL-FP
Const. Permit:
1975-12-31
Construction Start:
1975-04-01 IAEA
Operating Lic:
1985-02-14
First Criticality:
1985-02-02 IAEA
Grid Connection:
1985-03-01 IAEA
Commercial Op:
1985-09-16
License Renewed:
2015-11-19
License Exp:
2044-10-31
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
ENC
— East North Central
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets