B2B CHAMPION
1,522 days without a trip
·
7 Career Runs · 2 since last trip
Champion since Feb 7, 2025
Breaker-to-Breaker Runs
7 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
D.C. Cook 1 has logged 7 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 518 days, and its runs average 497 days.
518
Best Run (days)
U1C24 (2011-10-26) → U1C25 (2013-03-27)
★ Triple breaker-to-breaker
U1C27 → U1C28 → U1C29 → U1C30
All Runs
| 2025-04-30 |
2026-09-19 |
507 days |
U1C33 → U1C34 |
| 2023-11-14 |
2025-03-22 |
494 days |
U1C32 → U1C33 |
| 2019-05-10 |
2020-09-19 |
498 days |
U1C29 → U1C30 |
| 2017-11-28 |
2019-03-06 |
463 days |
U1C28 → U1C29 |
| 2016-04-28 |
2017-09-13 |
503 days |
U1C27 → U1C28 |
| 2013-05-19 |
2014-09-24 |
493 days |
U1C25 → U1C26 |
| 2011-10-26 |
2013-03-27 |
518 days |
U1C24 → U1C25 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Donald C. Cook Nuclear Plant.
Donald C. Cook Nuclear Plant is a two-unit nuclear station in Lake Township, Berrien County, Michigan, near Bridgman, on a 650-acre site on the shore of Lake Michigan, about 11 miles south of St. Joseph.
Read more
Construction began in March 1969. Both units are Westinghouse pressurized water reactors with ice condenser containment. Unit 1 was first connected to the grid on February 10, 1975, and Unit 2 on March 22, 1978. In 1976 two workers died from argon gas in a recirculation pit during welding. In September 1997 both units shut down for about three years after NRC inspections raised doubts about the emergency core cooling systems. On September 20, 2008, broken turbine blades led to a fire in the Unit 1 generator.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
D.C. Cook 1 has operated for about 51.2 years and averaged a 78.3% lifetime capacity factor, generating roughly 199.7 TWh of electricity. Its longest unbroken run reached 673 days.
Lifecycle & Tenure
Operating Age: 51.2 Yrs
Build Time: 6.4 Yrs
Lic. Remaining: 8 Yrs
Production & Power
Lifetime CF: 78.3%
Efficiency: 30.5%
Generated: 199.7 TWh
Reliability & Outages
Record Run: 673 Days
Refuelings: 17
Avg Startup: 5.6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
AEP
American Electric Power Company, Inc.
NasdaqGS
$129.86
▼ -0.47 (-0.36%)
Previous Close
130.33
Day's Range
128.73 – 130.38
52-Week Range
112.54 – 140.58
Volume
3,233,197
Operational Excellence Score Subscribers
D.C. Cook 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
4 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
D.C. Cook 1 has recorded 4 reactor scrams, or emergency shutdowns, since 2011 (2 automatic, 2 manual). On average the unit was back to full power about 7.5 days after each trip.
Recent Events
| 2022-08-28 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO REACTOR COOLANT PUMP TRIP The ... |
|
| 2022-05-24 |
Manual |
EN Revision Imported Date: 5/25/2022 EN Revision Text: MANUA... |
|
| 2014-11-01 |
Manual |
DUAL UNIT MANUAL REACTOR TRIPS DUE TO LOWERING CONDENSER VAC... |
|
| 2011-09-07 |
Auto |
AUTOMATIC REACTOR TRIP FOLLOWING MAIN TURBINE TRIP FROM 100%... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
3304 MWt
Net Capacity:
1009 MWe
Gross Capacity:
1,131 MWe IAEA
Design Capacity:
1,030 MWe IAEA
Efficiency:
30.5%
Lifetime Output:
321.5 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000315
License #:
DPR-58
License Type:
OL-FP
Const. Permit:
1969-03-25
Construction Start:
1969-03-25 IAEA
Operating Lic:
1974-10-25
First Criticality:
1975-01-18 IAEA
Grid Connection:
1975-02-10 IAEA
Commercial Op:
1975-08-28
License Renewed:
2005-08-30
License Exp:
2034-10-25
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
ENC
— East North Central
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)