D.C. Cook 1

Online · 100% power

Indiana Michigan Power·Bridgman, MI·PWR·1,009 MWe

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for D.C. Cook 1.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
   
Excellence
Rank locked · 93 units
Subscribers
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
14
Current Run
days
#75 of 95
Bottom Quartile
?
Longest recorded period of continuous operation between outages.
673
Record Run
days
#43 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (451 days for this 18-month cycle unit) with no trips to 0% power.
7
B2B Runs
#24 of 86
Mid Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
78.3%
Capacity Factor
#92 of 95
Bottom Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
18.51 TWh
Net Generation
EIA-923 · 12 mo to 2026-07 · plant total
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
4
Scrams
#17 of 94
Top Quartile
?
Years since commercial operation began. License remaining: 8 years.
51.2
Operating Age
years
8 yrs remaining

Excellence Score, Records & Plant Facts

B2B CHAMPION
1,522 days without a trip  ·  7 Career Runs  · 2 since last trip
Champion since Feb 7, 2025

About This Site

?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Donald C. Cook Nuclear Plant.

Donald C. Cook Nuclear Plant is a two-unit nuclear station in Lake Township, Berrien County, Michigan, near Bridgman, on a 650-acre site on the shore of Lake Michigan, about 11 miles south of St. Joseph.

Read more

Construction began in March 1969. Both units are Westinghouse pressurized water reactors with ice condenser containment. Unit 1 was first connected to the grid on February 10, 1975, and Unit 2 on March 22, 1978. In 1976 two workers died from argon gas in a recirculation pit during welding. In September 1997 both units shut down for about three years after NRC inspections raised doubts about the emergency core cooling systems. On September 20, 2008, broken turbine blades led to a fire in the Unit 1 generator.

11 miles south of Benton Harbor, Michigan Forum Lodging tips

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
D.C. Cook 1 has operated for about 51.2 years and averaged a 78.3% lifetime capacity factor, generating roughly 199.7 TWh of electricity. Its longest unbroken run reached 673 days.
Lifecycle & Tenure
Operating Age: 51.2 Yrs
Build Time: 6.4 Yrs
Lic. Remaining: 8 Yrs
Production & Power
Lifetime CF: 78.3%
Efficiency: 30.5%
Generated: 199.7 TWh
Reliability & Outages
Record Run: 673 Days
Refuelings: 17
Avg Startup: 5.6 Days

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Indiana Michigan Power
Architect Engineer: AEP
Constructor: AEP
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
AEP American Electric Power Company, Inc. NasdaqGS
$129.86 ▼ -0.47 (-0.36%)
Previous Close 130.33
Day's Range 128.73 – 130.38
52-Week Range 112.54 – 140.58
Volume 3,233,197
Delayed quote as of Nov 3, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Operational Excellence Score Subscribers

D.C. Cook 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.

  • This unit's composite score and fleet rank
  • Reliability, Efficiency and Discipline sub-scores
  • All seven measured inputs, with fleet percentiles
  • Rank against comparable units, not just the fleet
  • Three-year, five-year and lifetime windows
  • Five-year trend, and every other operating US reactor

Included with every outage subscription and with NukeWorker Gold membership. Trading the outage rather than working it? The same record, cut by power market, is on NukeGryd.

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-ICECND
NSS Supplier: WEST 4LP
Turbine Supplier: GENERAL ELECTRIC CO. IAEA
Thermal Power: 3304 MWt
Net Capacity: 1009 MWe
Gross Capacity: 1,131 MWe IAEA
Design Capacity: 1,030 MWe IAEA
Efficiency: 30.5%
Status: Operating
Lifetime Output: 321.5 TWh through 2025 IAEA

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000315
License #: DPR-58
License Type: OL-FP
Const. Permit: 1969-03-25
Construction Start: 1969-03-25 IAEA
Operating Lic: 1974-10-25
First Criticality: 1975-01-18 IAEA
Grid Connection: 1975-02-10 IAEA
Commercial Op: 1975-08-28
License Renewed: 2005-08-30
License Exp: 2034-10-25

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: ENC — East North Central
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)