B2B CHAMPION
1,364 days without a trip
·
6 Career Runs · 1 since last trip
Champion since Aug 9, 2025
Breaker-to-Breaker Runs
6 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Farley 1 has logged 6 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 522 days, and its runs average 509 days.
522
Best Run (days)
1R22 (2009-05-07) → 1R23 (2010-10-11)
★ Double breaker-to-breaker
1R25 → 1R26 → 1R27
All Runs
| 2024-05-10 |
2025-09-29 |
507 days |
1R32 → 1R33 |
| 2019-10-24 |
2021-03-22 |
515 days |
1R29 → 1R30 |
| 2015-05-31 |
2016-10-02 |
490 days |
1R26 → 1R27 |
| 2013-10-26 |
2015-03-30 |
520 days |
1R25 → 1R26 |
| 2009-05-07 |
2010-10-11 |
522 days |
1R22 → 1R23 |
| 2000-05-25 |
2001-10-06 |
499 days |
1R16 → 1R17 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Joseph M. Farley Nuclear Plant.
Joseph M. Farley Nuclear Plant is a two-unit nuclear station in Houston County, Alabama, near Columbia and about 20 miles east of Dothan, on the Chattahoochee River. It is named for Joseph M. Farley, who was president of Alabama Power from 1969 to 1989.
Read more
Alabama Power began construction on October 1, 1970, with Fluor Corporation as general contractor. Both units are three-loop Westinghouse pressurized water reactors. Unit 1 was first connected to the grid on August 18, 1977, and entered commercial operation on December 1, 1977. Unit 2 was connected on May 25, 1981, and entered commercial operation on July 30, 1981.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Farley 1 has operated for about 48.9 years and averaged a 90.8% lifetime capacity factor, generating roughly 192.4 TWh of electricity. Its longest unbroken run reached 523 days.
Lifecycle & Tenure
Operating Age: 48.9 Yrs
Build Time: 5.3 Yrs
Lic. Remaining: 10.6 Yrs
Production & Power
Lifetime CF: 90.8%
Efficiency: 32.3%
Generated: 192.4 TWh
Reliability & Outages
Record Run: 523 Days
Refuelings: 18
Avg Startup: 6.8 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
SO
The Southern Company
NYSE
$93.71
▲ +0.72 (+0.77%)
Previous Close
92.99
Day's Range
93.47 – 94.33
52-Week Range
81.69 – 99.58
Volume
6,067,469
Operational Excellence Score Subscribers
Farley 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
7 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Farley 1 has recorded 7 reactor scrams, or emergency shutdowns, since 2011 (5 automatic, 2 manual). On average the unit was back to full power about 11.4 days after each trip.
Recent Events
| 2023-02-01 |
Auto |
EN Revision Imported Date: 2/3/2023 EN Revision Text: AUTOMA... |
|
| 2022-08-03 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO LOSS OF POWER TO START-UP TRAN... |
|
| 2021-04-22 |
Auto |
EN Revision Imported Date: 5/21/2021 EN Revision Text: AUTOM... |
|
| 2016-11-27 |
Manual |
MANUAL REACTOR TRIP WITH AUTOMATIC AUXILIARY FEEDWATER SYSTE... |
|
| 2016-11-08 |
Manual |
MANUAL REACTOR TRIP DUE TO STEAM GENERATOR REDUCED FEEDFLOW ... |
|
| 2016-10-01 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO INADVERTENT CLOSURE OF MAIN ST... |
|
| 2013-06-11 |
Auto |
UNIT 1 AUTOMATIC REACTOR TRIP DUE TO THE LOSS OF A START-UP ... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
2775 MWt
Net Capacity:
895 MWe
Gross Capacity:
918 MWe IAEA
Design Capacity:
829 MWe IAEA
Efficiency:
32.3%
Lifetime Output:
302.5 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000348
License #:
NPF-2
License Type:
OL-FP
Const. Permit:
1972-08-16
Construction Start:
1970-10-01 IAEA
Operating Lic:
1977-06-25
First Criticality:
1977-08-09 IAEA
Grid Connection:
1977-08-18 IAEA
Commercial Op:
1977-12-01
License Renewed:
2005-05-12
License Exp:
2037-06-25
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
ESC
— East South Central
Balancing Authority:
SOCO
— Southern Company
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)