About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Edwin I. Hatch Nuclear Power Plant.
The Edwin I. Hatch Nuclear Plant has two units near Baxley, in Appling County, Georgia, about 11 miles north of the town. It uses water from the Altamaha River.
Read more
Both units use General Electric BWR-4 boiling water reactors. Construction of Unit 1 began on September 30, 1968, and Unit 2 followed on February 1, 1972. Unit 1 connected to the grid on November 11, 1974, and Unit 2 on September 22, 1978.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Hatch 1 has operated for about 50.8 years and averaged a 90.2% lifetime capacity factor, generating roughly 192.4 TWh of electricity. Its longest unbroken run reached 706 days.
Lifecycle & Tenure
Operating Age: 50.8 Yrs
Build Time: 6.3 Yrs
Lic. Remaining: 7.8 Yrs
Production & Power
Lifetime CF: 90.2%
Efficiency: 31.2%
Generated: 192.4 TWh
Reliability & Outages
Record Run: 706 Days
Refuelings: 15
Avg Startup: 9.6 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
SO
The Southern Company
NYSE
$92.89
▼ -0.93 (-0.99%)
Previous Close
93.82
Day's Range
92.68 – 94.03
52-Week Range
81.69 – 99.58
Volume
5,097,677
Operational Excellence Score Subscribers
Hatch 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
9 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Hatch 1 has recorded 9 reactor scrams, or emergency shutdowns, since 2011 (4 automatic, 5 manual). On average the unit was back to full power about 8.8 days after each trip.
Recent Events
| 2026-10-10 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2026-04-23 |
Auto |
AUTOMATIC REACTOR SCRAM The following information was provid... |
|
| 2026-02-26 |
Manual |
MANUAL REACTOR SCRAM The following information was provided ... |
|
| 2024-09-27 |
Manual |
MANUAL REACTOR TRIP ON LOWERING CONDENSER VACUUM The followi... |
|
| 2024-03-11 |
Manual |
MANUAL REACTOR TRIP The following information was provided b... |
|
| 2021-12-29 |
Manual |
EN Revision Imported Date: 1/28/2022 EN Revision Text: MANUA... |
|
| 2021-08-03 |
Auto |
EN Revision Imported Date: 9/3/2021 EN Revision Text: AUTOMA... |
|
| 2017-04-20 |
Auto |
AUTOMATIC REACTOR SCRAM DURING STARTUP "On 04/20/2017 at 030... |
|
+1 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
2804 MWt
Net Capacity:
876 MWe
Gross Capacity:
911 MWe IAEA
Design Capacity:
777 MWe IAEA
Efficiency:
31.2%
Lifetime Output:
296.2 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000321
License #:
DPR-57
License Type:
OL-FP
Const. Permit:
1969-09-30
Construction Start:
1968-09-30 IAEA
Operating Lic:
1974-10-13
First Criticality:
1974-09-12 IAEA
Grid Connection:
1974-11-11 IAEA
Commercial Op:
1975-12-31
License Renewed:
2002-06-15
License Exp:
2034-08-06
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
SAT
— South Atlantic
Balancing Authority:
SOCO
— Southern Company
Market Structure:
Regulated