Pilgrim 1 — Decommissioned Reactor Data & History

Operational history, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Pilgrim 1.

Decommissioned

Permanently shut down on 2019-05-31. View Outage History →
?
Current reactor power level from the most recent NRC daily report.
Shut Down
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
2,519
Current Run
days
?
Longest recorded period of continuous operation between outages.
2,519
Record Run
days
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (614 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
88.9%
Capacity Factor
?
Community rating score (Bayesian-adjusted). Based on 64 votes. Ranked against all rated facilities.
47.6
Rating
64 votes
#76 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
13
Scrams
?
Years since commercial operation began.
46.5
Operating Age
years

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Pilgrim 1 has completed 11 scheduled refueling outages on record, averaging 37 days each. The most recent, in Jun 2019, ran 87 days.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Pilgrim 1 has spent 410 days in scheduled refueling outages and 219 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Pilgrim 1 has operated for about 46.5 years and averaged a 88.9% lifetime capacity factor, generating roughly 110.2 TWh of electricity. Its longest unbroken run reached 2,519 days.
Lifecycle & Tenure
Operating Age: 46.5 Yrs
Build Time: 4.3 Yrs
Lic. Remaining: N/A Yrs
Production & Power
Lifetime CF: 88.9%
Efficiency: 34.3%
Generated: 110.2 TWh
Reliability & Outages
Record Run: 2,519 Days
Refuelings: 11
Avg Startup: 7.9 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
600 Rocky Hill Road
Plymouth, MA 02360, USA
Get Directions
Phone: (508) 830-8000

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$126
Lodging/Night
$80
M&IE/Day
$206
Total/Day
Plymouth / Taunton / New Bedford, Plymouth / Bristol County, MA

Unemployment Benefits MA

?
Maximum state unemployment insurance benefits for MA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$1,105
Max Weekly
30
Max Weeks
$33,150
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Holtec International
Architect Engineer: BECH
Constructor: BECH

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 1
NSS Supplier: GE 3
Thermal Power: 1998 MWt
Net Capacity: 685 MWe
Efficiency: 34.3%

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000293
License #: DPR-35
License Type: OL-FP
Const. Permit: 1968-08-26
Operating Lic: 1972-09-15
Commercial Op: 1972-12-01
License Renewed: 2012-05-29
License Exp: 2012-06-08