4,441 days without a trip
·
11 Career Runs · 7 since last trip
Champion since Feb 2, 2017
Breaker-to-Breaker Runs
11 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Point Beach 2 has logged 11 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 557 days, and its runs average 510 days.
557
Best Run (days)
U2R39 (2023-04-04) → U2R40 (2024-10-12)
★ 7-run breaker-to-breaker
U2R34 → U2R35 → U2R36 → U2R37 → U2R38 → U2R39 → U2R40 → U2R41
All Runs
| 2024-11-01 |
2026-03-14 |
498 days |
U2R40 → U2R41 |
| 2023-04-04 |
2024-10-12 |
557 days |
U2R39 → U2R40 |
| 2021-11-03 |
2023-03-11 |
493 days |
U2R38 → U2R39 |
| 2020-04-05 |
2021-10-09 |
552 days |
U2R37 → U2R38 |
| 2018-10-26 |
2020-03-14 |
505 days |
U2R36 → U2R37 |
| 2017-04-14 |
2018-10-06 |
540 days |
U2R35 → U2R36 |
| 2015-10-31 |
2017-03-18 |
504 days |
U2R34 → U2R35 |
| 2012-12-01 |
2014-03-17 |
471 days |
U2R32 → U2R33 |
| 2008-05-09 |
2009-10-15 |
524 days |
U2R29 → U2R30 |
| 2006-11-17 |
2008-04-06 |
506 days |
U2R28 → U2R29 |
| 2005-07-09 |
2006-10-16 |
464 days |
U2R27 → U2R28 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Point Beach Nuclear Plant.
Point Beach Nuclear Plant sits on the western shore of Lake Michigan in the Town of Two Creeks, Manitowoc County, Wisconsin, near the city of Two Rivers.
Read more
Wisconsin Electric Power Company built the plant, with a groundbreaking on November 28, 1966. It has two Westinghouse two-loop pressurized water reactors. Construction of Unit 1 began in July 1967 and Unit 2 in July 1968. Unit 1 reached initial criticality on November 2, 1970, and entered commercial operation on December 21, 1970. Unit 2 followed in 1972, with commercial operation dated October 1, 1972. Steam generator degradation held Unit 1 to reduced power from December 1979 until replacement steam generators were installed in October 1983. Unit 2's steam generators were replaced in 1996 and 1997.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Point Beach 2 has operated for about 54.1 years and averaged a 90.7% lifetime capacity factor, generating roughly 124.8 TWh of electricity. Its longest unbroken run reached 558 days.
Lifecycle & Tenure
Operating Age: 54.1 Yrs
Build Time: 4.2 Yrs
Lic. Remaining: 26.4 Yrs
Production & Power
Lifetime CF: 90.7%
Efficiency: 33.5%
Generated: 124.8 TWh
Reliability & Outages
Record Run: 558 Days
Refuelings: 18
Avg Startup: 5.8 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Aug 7, 2000 |
Operator change |
WE Energies (owner, operated it) |
Nuclear Management Co (operator only) |
| Sep 28, 2007 |
Sold |
WE Energies |
NextEra (FPL) |
NEE
NextEra Energy, Inc.
NYSE
$78.28
▼ -0.58 (-0.74%)
Previous Close
78.86
Day's Range
77.93 – 79.85
52-Week Range
74.41 – 98.75
Volume
14,692,813
NextEra Energy and Dominion Energy (D) announced a merger on 2026-05-18, subject to regulatory and shareholder approval.
Operational Excellence Score Subscribers
Point Beach 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
2 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Point Beach 2 has recorded 2 reactor scrams, or emergency shutdowns, since 2011 (1 automatic, 1 manual). On average the unit was back to full power about 12.5 days after each trip.
Recent Events
| 2012-06-27 |
Manual |
MANUAL REACTOR TRIP DUE TO 100% LOAD REJECT "Unit 2 Manual R... |
|
| 2011-06-13 |
Auto |
AUTOMATIC REACTOR TRIP DURING STARTUP PHYSICS TESTING "On Ju... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
1800 MWt
Net Capacity:
603 MWe
Gross Capacity:
640 MWe IAEA
Design Capacity:
497 MWe IAEA
Efficiency:
33.5%
Lifetime Output:
210.2 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000301
License #:
DPR-27
License Type:
OL-FP
Const. Permit:
1968-07-25
Construction Start:
1968-07-25 IAEA
Operating Lic:
1973-03-08
First Criticality:
1972-05-30 IAEA
Grid Connection:
1972-08-02 IAEA
Commercial Op:
1972-10-01
License Renewed:
2025-09-29
License Exp:
2053-03-08
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
ENC
— East North Central
Balancing Authority:
MISO
— Midcontinent Independent System Operator (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets