Robinson 2 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Robinson 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
50
Excellence
#49 of 94
Mid Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
525
Current Run
days
#5 of 95
Top Quartile
?
Longest recorded period of continuous operation between outages.
714
Record Run
days
#33 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (610 days for this 24-month cycle unit) with no trips to 0% power.
--
B2B Runs
85% toward B2B (517/610d)
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
89.7%
Capacity Factor
#51 of 95
Mid Quartile
?
Community rating score (Bayesian-adjusted). Based on 24 votes. Ranked against all rated facilities.
44.5
Rating
24 votes
#84 of 97
Bottom Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
8
Scrams
#57 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 4.2 years.
55.2
Operating Age
years
4.2 yrs remaining
?
Composite Operational Excellence Score for Robinson 2 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 49 of 94 ↑10

Time window
NukeWorker's
Operational
Excellence Score
50/100
Mid Quartile · #49/94
5-year window

Robinson 2 ranks #49 of 94 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Capacity Factor (81th percentile). Weakest: Refuel Duration (16th percentile).

Reliability
54
Capacity factor + Forced outages + B2B streaks
Efficiency
46
Fuel utilization + Refuel duration
Discipline
49
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #33 of 61 PWR
Containment: #29 of 48 Dry Ambient (PWR)
Cycle length: #23 of 40 24-month cycle
Fleet rank above (49 of 94) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 81th
94.5% (higher better, Reliability)
Forced Outage Days/yr 27th
6.8d (lower better, Reliability)
Fuel Utilization 75th
98.6% (higher better, Efficiency)
Refuel Duration 16th
40d (lower better, Efficiency)
Startup Duration 29th
5.7d (lower better, Discipline)
Scrams (5-year) 70th
0.2/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (94 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 94 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 38/100 (#66/93)2022: 36/100 (#66/92)2023: 29/100 (#79/92)2024: 53/100 (#40/93)2025: 43/100 (#62/94)2026: 47/100 (#52/94) ↑ +3.1 pts vs 2025
Compare Robinson 2 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
99.5%
365-Day Avg
#26
of 94 plants
Min: 17% Max: 100% 2 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Lifecycle & Tenure
Operating Age: 55.2 Yrs
Build Time: 3.9 Yrs
Lic. Remaining: 4.2 Yrs
Production & Power
Lifetime CF: 89.7%
Efficiency: 32.4%
Generated: 163.2 TWh
Reliability & Outages
Record Run: 714 Days
Refuelings: 16
Avg Startup: 4.5 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
3581 West Entrance Road
Hartsville, SC 29550, USA
Get Directions
Phone: (803) 857-1000

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, SC

Unemployment Benefits SC

?
Maximum state unemployment insurance benefits for SC. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$326
Max Weekly
20
Max Weeks
$6,520
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Duke Energy
Architect Engineer: EBSO
Constructor: EBSO

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 3LP
Thermal Power: 2339 MWt
Net Capacity: 759 MWe
Efficiency: 32.4%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000261
License #: DPR-23
License Type: OL-FP
Const. Permit: 1967-04-13
Operating Lic: 1970-07-31
Commercial Op: 1971-03-07
License Renewed: 2004-04-19
License Exp: 2030-07-31

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: SERC — SERC Reliability Corporation
Census Region: SAT — South Atlantic
Balancing Authority: CPLE — Duke Energy Progress East (formerly Carolina Power & Light - East)
Market Structure: Regulated — Rate-regulated utility (cost-of-service pricing)