Breaker-to-Breaker Runs
7 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Saint Lucie 1 has logged 7 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 521 days, and its runs average 498 days.
521
Best Run (days)
SL1-31 (2022-10-05) → SL1-32 (2024-03-09)
All Runs
| 2022-10-05 |
2024-03-09 |
521 days |
SL1-31 → SL1-32 |
| 2019-11-19 |
2021-04-10 |
508 days |
SL1-29 → SL1-30 |
| 2013-12-19 |
2015-03-23 |
459 days |
SL1-25 → SL1-26 |
| 2008-11-21 |
2010-04-05 |
500 days |
SL1-22 → SL1-23 |
| 2005-12-19 |
2007-04-02 |
469 days |
SL1-20 → SL1-21 |
| 2002-10-25 |
2004-03-22 |
514 days |
SL1-18 → SL1-19 |
| 1999-11-01 |
2001-04-02 |
518 days |
SL1-16 → SL1-17 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: St. Lucie Nuclear Power Plant.
St. Lucie Nuclear Power Plant is on Hutchinson Island, a barrier island on Florida's Atlantic coast in St. Lucie County, near Fort Pierce and Port St. Lucie. It uses Atlantic Ocean water for cooling.
Read more
Florida Power & Light built the plant, which has two Combustion Engineering pressurized water reactors. Construction of Unit 1 began on July 1, 1970, and the unit entered commercial operation on December 21, 1976. Construction of Unit 2 began on June 2, 1977, and the unit entered commercial operation on August 8, 1983, about 59 months after construction began. In 1978 an eight-inch mesh barrier net was installed in the intake canal to restrict the movement of sea turtles.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Saint Lucie 1 has operated for about 49.8 years and averaged a 88.7% lifetime capacity factor, generating roughly 199.2 TWh of electricity. Its longest unbroken run reached 551 days.
Lifecycle & Tenure
Operating Age: 49.8 Yrs
Build Time: 6.5 Yrs
Lic. Remaining: 29.4 Yrs
Production & Power
Lifetime CF: 88.7%
Efficiency: 32.5%
Generated: 199.2 TWh
Reliability & Outages
Record Run: 551 Days
Refuelings: 18
Avg Startup: 4.3 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
No change of owner, operator or management company on record. Our history starts in 1999.
NEE
NextEra Energy, Inc.
NYSE
$80.82
▲ +2.54 (+3.24%)
Previous Close
78.28
Day's Range
78.64 – 81.00
52-Week Range
74.41 – 98.75
Volume
8,164,601
NextEra Energy and Dominion Energy (D) announced a merger on 2026-05-18, subject to regulatory and shareholder approval.
Operational Excellence Score Subscribers
Saint Lucie 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
17 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Saint Lucie 1 has recorded 17 reactor scrams, or emergency shutdowns, since 2011 (7 automatic, 10 manual). On average the unit was back to full power about 15.9 days after each trip.
Recent Events
| 2026-08-13 |
Manual |
EN Revision Imported Date: 8/17/2026 EN Revision Text: MANUA... |
|
| 2024-11-15 |
Manual |
MANUAL REACTOR TRIP The following information was provided b... |
|
| 2024-07-28 |
Auto |
AUTOMATIC REACTOR TRIP The following information was provide... |
|
| 2022-09-02 |
Manual |
MANUAL REACTOR TRIP DUE TO LOSS OF FEED PUMP The following i... |
|
| 2021-12-10 |
Manual |
EN Revision Imported Date: 1/10/2022 EN Revision Text: MANUA... |
|
| 2019-09-07 |
Auto |
AUTOMATIC REACTOR TRIP "On September 09, 2019 at 0824 EDT, w... |
|
| 2019-04-25 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO TURBINE GENERATOR TRIP "At 091... |
|
| 2018-10-29 |
Manual |
MANUAL REACTOR TRIP DUE TO INADEQUATE FEEDWATER FLOW"On Octo... |
|
+9 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
3020 MWt
Net Capacity:
981 MWe
Gross Capacity:
1,045 MWe IAEA
Design Capacity:
830 MWe IAEA
Efficiency:
32.5%
Lifetime Output:
315.2 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000335
License #:
DPR-67
License Type:
OL-FP
Const. Permit:
1970-07-01
Construction Start:
1970-07-01 IAEA
Operating Lic:
1976-03-01
First Criticality:
1976-04-22 IAEA
Grid Connection:
1976-05-07 IAEA
Commercial Op:
1976-12-21
License Renewed:
2026-04-28
License Exp:
2056-03-01
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
SAT
— South Atlantic
Balancing Authority:
FPL
— Florida Power & Light
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)