713 days without a trip
·
10 Career Runs · 1 since last trip
Champion since Feb 19, 2026
Breaker-to-Breaker Runs
10 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Seabrook 1 has logged 10 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 525 days, and its runs average 504 days.
525
Best Run (days)
OR16 (2014-04-24) → OR17 (2015-10-01)
★ Quadruple breaker-to-breaker
OR18 → OR19 → OR20 → OR21 → OR22
All Runs
| 2024-11-21 |
2026-04-04 |
499 days |
OR23 → OR24 |
| 2021-11-05 |
2023-04-01 |
512 days |
OR21 → OR22 |
| 2020-06-11 |
2021-10-02 |
478 days |
OR20 → OR21 |
| 2018-10-28 |
2020-04-01 |
521 days |
OR19 → OR20 |
| 2017-05-01 |
2018-10-01 |
518 days |
OR18 → OR19 |
| 2014-04-24 |
2015-10-01 |
525 days |
OR16 → OR17 |
| 2012-10-30 |
2014-04-01 |
518 days |
OR15 → OR16 |
| 2009-12-17 |
2011-04-01 |
470 days |
OR13 → OR14 |
| 2008-05-08 |
2009-10-01 |
511 days |
OR12 → OR13 |
| 2002-05-31 |
2003-10-04 |
491 days |
OR8 → OR9 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Seabrook Station Nuclear Power Plant.
Seabrook Station is on the Atlantic coast at Seabrook, New Hampshire, about 40 miles north of Boston and about 10 miles south of Portsmouth. Seawater from the Atlantic provides its cooling.
Read more
It has one Westinghouse four-loop pressurized water reactor. Construction began in 1976. The Clamshell Alliance formed that year, and in May 1977 more than 2,000 protesters occupied the construction site, with 1,414 arraigned on criminal trespass charges. A second unit was cancelled in 1984 at about 25 percent complete, after roughly $800 million had been spent. Public Service Company of New Hampshire, the original owner, went bankrupt in 1988. The reactor connected to the grid on May 29, 1990, and entered commercial operation on August 19, 1990.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Seabrook 1 has operated for about 36.2 years and averaged a 90.5% lifetime capacity factor, generating roughly 275.2 TWh of electricity. Its longest unbroken run reached 528 days.
Lifecycle & Tenure
Operating Age: 36.2 Yrs
Build Time: 14.1 Yrs
Lic. Remaining: 23.4 Yrs
Production & Power
Lifetime CF: 90.5%
Efficiency: 34.3%
Generated: 275.2 TWh
Reliability & Outages
Record Run: 528 Days
Refuelings: 19
Avg Startup: 7.1 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Nov 1, 2002 |
Sold |
North Atlantic Energy |
NextEra (FPL) |
NEE
NextEra Energy, Inc.
NYSE
$84.32
▼ -0.71 (-0.83%)
Previous Close
85.03
Day's Range
83.80 – 85.01
52-Week Range
74.41 – 98.75
Volume
1,922,184
NextEra Energy and Dominion Energy (D) announced a merger on 2026-05-18, subject to regulatory and shareholder approval.
Operational Excellence Score Subscribers
Seabrook 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
9 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Seabrook 1 has recorded 9 reactor scrams, or emergency shutdowns, since 2011 (4 automatic, 5 manual). On average the unit was back to full power about 15.1 days after each trip.
Recent Events
| 2024-11-19 |
Manual |
EN Revision Imported Date: 11/20/2024 EN Revision Text: MANU... |
|
| 2023-07-30 |
Manual |
MANUAL REACTOR TRIP DUE TO LOW MAIN TURBINE ELECTRO-HYDRAULI... |
|
| 2020-06-06 |
Manual |
MANUAL REACTOR TRIP WHEN GROUP ONE, BANK 'B' CONTROL RODS IN... |
|
| 2020-05-29 |
Manual |
MANUAL TRIP DUE TO ROD BANK UNEXPECTEDLY INSERTING "At 1403 ... |
|
| 2017-04-29 |
Manual |
MANUAL REACTOR TRIP DUE TO STEAM GENERATOR HI-HI LEVEL SIGNA... |
|
| 2016-03-02 |
Auto |
TURBINE TRIP CAUSING A REACTOR TRIP "The turbine tripped for... |
|
| 2014-04-01 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO ELECTRICAL ISSUE "At 0026 on 0... |
|
| 2012-09-14 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO LOW STEAM GENERATOR WATER LEVE... |
|
+1 more events
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
3648 MWt
Net Capacity:
1250 MWe
Gross Capacity:
1,296 MWe IAEA
Design Capacity:
1,149 MWe IAEA
Efficiency:
34.3%
Lifetime Output:
330.7 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000443
License #:
NPF-86
License Type:
OL-FP
Const. Permit:
1976-07-07
Construction Start:
1976-07-07 IAEA
Operating Lic:
1990-03-15
First Criticality:
1989-06-13 IAEA
Grid Connection:
1990-05-29 IAEA
Commercial Op:
1990-08-19
License Renewed:
2019-03-12
License Exp:
2050-03-15
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
NPCC
— Northeast Power Coordinating Council
Census Region:
NEW
— New England
Balancing Authority:
ISNE
— ISO New England (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets