South Texas 2 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for South Texas 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
58
Excellence
#33 of 94
Mid Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
170
Current Run
days
#45 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
549
Record Run
days
#66 of 95
Mid Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (456 days for this 18-month cycle unit) with no trips to 0% power.
10
B2B Runs
#11 of 87
Top Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
89%
Capacity Factor
#61 of 95
Mid Quartile
?
Community rating score (Bayesian-adjusted). Based on 40 votes. Ranked against all rated facilities.
54.3
Rating
40 votes
#38 of 97
Mid Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
5
Scrams
#31 of 94
Mid Quartile
?
Years since commercial operation began. License remaining: 22.6 years.
36.9
Operating Age
years
22.6 yrs remaining
?
Composite Operational Excellence Score for South Texas 2 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 33 of 94

Time window
NukeWorker's
Operational
Excellence Score
58/100
Mid Quartile · #33/94
5-year window

South Texas 2 ranks #33 of 94 active US units on NukeWorker's Operational Excellence Score over the 5-year window. Strongest area: Fuel Utilization (72th percentile). Weakest: B2B Avg Streak (37th percentile).

Reliability
53
Capacity factor + Forced outages + B2B streaks
Efficiency
63
Fuel utilization + Refuel duration
Discipline
60
Startup duration + Scram count
Cohort Rankings apples-to-apples comparison within each peer group
Reactor type: #21 of 61 PWR
Containment: #18 of 48 Dry Ambient (PWR)
Cycle length: #16 of 54 18-month cycle
Fleet rank above (33 of 94) compares all active US units; cohort ranks compare only against units sharing this property.
Per-dimension breakdown (7 metrics)
Capacity Factor 62th
92.4% (higher better, Reliability)
Forced Outage Days/yr 59th
2.8d (lower better, Reliability)
B2B Avg Streak 37th
508d (higher better, Reliability)
Fuel Utilization 72th
98.5% (higher better, Efficiency)
Refuel Duration 53th
32d (lower better, Efficiency)
Startup Duration 72th
3.6d (lower better, Discipline)
Scrams (5-year) 48th
0.4/yr (lower better, Discipline)

Each dimension's percentile is computed across the active US fleet (94 units with sufficient history). Sub-score = average of its component percentiles. Composite = average of the three sub-scores. 5-year window. View full leaderboard →

Methodology

NukeWorker's Operational Excellence Score is a composite ranking that combines 7 publicly observable performance metrics into a single 0-100 number per US nuclear unit.

How it's computed: Each unit's raw value is converted to a percentile (0-100) within the 94 active US units that have at least 2 completed refueling cycles. The 7 percentiles are averaged into 3 sub-scores (Reliability, Efficiency, Discipline), and those are averaged into the final composite.

Active window — 5-year:

  • Reliability — Capacity factor (5yr), forced outage days/yr (5yr), B2B avg streak (lifetime)
  • Efficiency — in-cycle fuel utilization (3yr), median refuel duration (5yr)
  • Discipline — robust mean startup duration, scrams/yr (5yr, annualised)

Cohort rankings: alongside the fleet rank, each unit gets ranked within its reactor type (PWR/BWR), containment design (Ice Condenser, Mark I, etc.), and cycle length (12/18/24-month). Useful for apples-to-apples comparisons.

What's excluded: subjective community ratings, confidential INPO ratings, financial metrics. We only use publicly available NRC + cycle data.

Why three windows? 5yr (default) is the industry standard. 3yr captures recent operational changes and post-pandemic recovery. Lifetime gives newer units a fair comparison and reveals long-term consistency.

Edge cases: units with fewer than 2 cycles (e.g., Vogtle 4) show "Provisional". Decommissioned units excluded.

Refresh cadence: recomputed daily. Each window cached separately.

A data-derived proxy for operational performance; not affiliated with INPO. INPO ratings are confidential and qualitative — ours is public and quantitative.

5-yr trend: 2021: 70/100 (#21/93)2022: 67/100 (#23/92)2023: 71/100 (#18/92)2024: 57/100 (#31/93)2025: 51/100 (#40/94)2026: 51/100 (#42/94) Stable vs 2025
Compare South Texas 2 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
89.5%
365-Day Avg
#23
of 94 plants
Min: 0% Max: 100% 39 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Lifecycle & Tenure
Operating Age: 36.9 Yrs
Build Time: 13.5 Yrs
Lic. Remaining: 22.6 Yrs
Production & Power
Lifetime CF: 89%
Efficiency: 33.2%
Generated: 272.9 TWh
Reliability & Outages
Record Run: 549 Days
Refuelings: 19
Avg Startup: 4.9 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
8 miles west of Wadsworth on Farm Road 521
Palacious, TX 77465, USA
Get Directions
Phone: (512) 972-3611

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, TX

Unemployment Benefits TX

?
Maximum state unemployment insurance benefits for TX. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$605
Max Weekly
26
Max Weeks
$15,730
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: STP Nuclear Operating
Architect Engineer: BECH
Constructor: EBSO

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: PWR
Containment: PWR-DRYAMB
NSS Supplier: WEST 4LP
Thermal Power: 3853 MWt
Net Capacity: 1280 MWe
Efficiency: 33.2%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000499
License #: NPF-80
License Type: OL-FP
Const. Permit: 1975-12-22
Operating Lic: 1989-03-28
Commercial Op: 1989-06-19
License Renewed: 2017-09-28
License Exp: 2048-12-15

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: TRE — Texas Regional Entity
Census Region: WSC — West South Central
Balancing Authority: ERCO — Electric Reliability Council of Texas (ERCOT) (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets