Susquehanna 2 — Nuclear Reactor Data & Live Status

Live reactor status, daily power data, outage history & performance charts, scram history, capacity factor & statistics, community ratings, technical specifications, NRC licensing data, photos, nearby jobs, satellite map, contact information, and per diem rates for Susquehanna 2.

?
Composite Operational Excellence Score (0-100) — average percentile rank across 7 dimensions in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). 5-year window. Higher = more operationally excellent. Click to see the full breakdown.
37
Excellence
#66 of 93
Mid Quartile
?
Current reactor power level from the most recent NRC daily report.
100%
Power
ONLINE
?
Days of continuous operation since the last outage ended. Ranked against all operating units.
312
Current Run
days
#31 of 95
Mid Quartile
?
Longest recorded period of continuous operation between outages.
727
Record Run
days
#22 of 95
Top Quartile
?
Breaker-to-Breaker runs — continuous operation exceeding the cycle-adjusted threshold (584 days for this 24-month cycle unit) with no trips to 0% power.
4
B2B Runs
#60 of 87
Mid Quartile
?
Lifetime capacity factor: average power level across all recorded days (100% = always at full power). Ranked against all NRC-tracked units.
89.5%
Capacity Factor
#57 of 95
Mid Quartile
?
Net electricity actually generated over the most recent 12 months reported by the U.S. Energy Information Administration (Form EIA-923), summed across every unit at this plant. These are authoritative actuals, not an estimate.
19.54 TWh
Net Generation
EIA-923 · 12 mo to 2026-06 · plant total
?
Community rating score (Bayesian-adjusted). Based on 63 votes. Ranked against all rated facilities.
66.9
Rating
63 votes
#4 of 97
Top Quartile
?
Total NRC-reported scram events (emergency reactor shutdowns). Ranked fleet-wide — fewer scrams = better rank.
10
Scrams
#75 of 94
Bottom Quartile
?
Years since commercial operation began. License remaining: 17.5 years.
41.6
Operating Age
years
17.5 yrs remaining

Reactor Status Timeline

Online NRC data, Mon to Fri ? Actual daily reactor status from NRC reports (Mon to Fri) and the current state. What is coming -- the utility's published Scheduled outage and NukeWorker's model Projection -- is part of a subscription. Colored by status. How far ahead you can see depends on your plan.
Oct2025NovDecJan2026FebMarAprMayJunJulAugSepOnline: Sep 7, 2025 to Oct 13, 2025Reduced Power: Oct 14, 2025 to Oct 25, 2025Online: Oct 26, 2025 to Oct 28, 2025Scram: Oct 29, 2025 to Oct 30, 2025Reduced Power: Oct 31, 2025 to Nov 3, 2025Online: Nov 4, 2025 to Nov 23, 2025Reduced Power: Nov 24, 2025Online: Nov 25, 2025 to Feb 13, 2026Reduced Power: Feb 14, 2026Online: Feb 15, 2026 to Jun 25, 2026Reduced Power: Jun 26, 2026Online: Jun 27, 2026 to Aug 7, 2026Reduced Power: Aug 8, 2026Online: Aug 9, 2026 to Sep 7, 2026Scram (reactor trip): Oct 28, 2025Today
OnlineReduced PowerScramScram (reactor trip)
Full history & analysis →
?
Composite Operational Excellence Score for Susquehanna 2 — average percentile rank across 7 publicly observable metrics in three sub-scores: Reliability (capacity factor, forced outage days, B2B avg streak), Efficiency (fuel utilization, refuel duration), and Discipline (startup duration, scram count). Toggle the time window (3yr / 5yr / Lifetime) to see how this unit's standing shifts. Each dimension percentile-ranked across the active US fleet. Sub-score = average of components. Composite = average of the three sub-scores.

NukeWorker's Operational Excellence Score 5-yr composite · ranks 66 of 93 ↓29

NukeWorker scores Susquehanna 2's operational excellence at 37 out of 100 over the past five years, ranking it 66 of 93 reactors in the active US fleet. The score blends reliability, efficiency, and operating discipline drawn from public performance data.
Time window
5-yr trend: 2021: 55/100 (#44/93)2022: 57/100 (#38/92)2023: 56/100 (#34/92)2024: 52/100 (#41/92)2025: 52/100 (#37/92)2026: 37/100 (#66/93) ↓ -14.5 pts vs 2025
Compare Susquehanna 2 head-to-head with up to 3 other units. Compare now

Capacity Factor (365-Day)

?
100%
Current
98%
365-Day Avg
#61
of 94 plants
Min: 0% Max: 100% 8 days <80%

Outage Duration Trend

?
Scheduled refueling outage durations over time. Green bars are below average, yellow near average, red above. Dashed line shows the plant's historical average. Shorter outages mean better execution.
Susquehanna 2 has completed 14 scheduled refueling outages on record, averaging 43 days each. The most recent, in Mar 2025, ran 72 days.

Power History (12-Month)

?
Daily power output as a percentage of rated capacity over the past 365 days. Green segments indicate full power (90%+), yellow shows reduced output, and red indicates significant power reductions or shutdowns.
Over the past 12 months Susquehanna 2 has run at an average of 98% of rated power. On the chart, green stretches are full-power running and dips toward zero mark reduced output or outages.

Outage Days by Year

?
Total days spent in outage each year, split by scheduled refueling (blue) and forced/unplanned (red). Lower totals indicate better reliability and outage execution. Hover for details.
Across its recorded history, Susquehanna 2 has spent 606 days in scheduled refueling outages and 170 days in forced or unplanned outages. Taller bars mark the years with the most downtime.

Facility Statistics

?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Susquehanna 2 has operated for about 41.6 years and averaged a 89.5% lifetime capacity factor, generating roughly 266.5 TWh of electricity. Its longest unbroken run reached 727 days.
Lifecycle & Tenure
Operating Age: 41.6 Yrs
Build Time: 11.3 Yrs
Lic. Remaining: 17.5 Yrs
Production & Power
Lifetime CF: 89.5%
Efficiency: 31.6%
Generated: 266.5 TWh
Reliability & Outages
Record Run: 727 Days
Refuelings: 14
Avg Startup: 8.2 Days

Location & Contact

?
Physical address, phone number, and website for this facility. Use the directions link to get driving directions via Google Maps.
Address:
634 Salem Boulevard
Berwick, PA 18603, USA
Get Directions
Phone: (717) 542-3300

Per Diem Rates FY 2026

?
Per diem covers lodging and meals & incidental expenses (M&IE) for government and contractor travel near this facility. Rates are from GSA for FY 2026.
$110
Lodging/Night
$68
M&IE/Day
$178
Total/Day
Standard Rate, PA

Unemployment Benefits PA

?
Maximum state unemployment insurance benefits for PA. Actual benefits depend on your earnings history and may be lower than the maximum. Data as of Jan 2026.
$605
Max Weekly
26
Max Weeks
$15,730
Max Total
7-day waiting period before benefits begin

Ownership & Construction

?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Owner/Operator: Talen Energy
Architect Engineer: BECH
Constructor: BECH
TLN Talen Energy Corporation NasdaqGS
$317.00 ▲ +11.48 (+3.76%)
Previous Close 305.52
Day's Range 304.73 – 317.47
52-Week Range 288.58 – 451.28
Volume 577,750
Delayed quote as of Sep 4, 2026 4:00 PM ET. Source: Yahoo Finance. Full quote on Yahoo Finance

Technical Specs

?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Reactor Type: BWR
Containment: BWR-MARK 2
NSS Supplier: GE 4
Thermal Power: 3952 MWt
Net Capacity: 1247 MWe
Efficiency: 31.6%
Status: Operating

Licensing

?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #: 05000388
License #: NPF-22
License Type: OL-FP
Const. Permit: 1973-11-03
Operating Lic: 1984-03-23
Commercial Op: 1985-02-12
License Renewed: 2009-11-17
License Exp: 2044-03-23

Market & Region

?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region: RFC — Reliability First Corporation
Census Region: MAT — Middle Atlantic
Balancing Authority: PJM — PJM Interconnection (ISO/RTO)
Market Structure: Merchant — Competitive generator selling into wholesale markets