1,581 days without a trip
·
9 Career Runs · 2 since last trip
Champion since Feb 13, 2024
Breaker-to-Breaker Runs
9 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Beaver Valley 1 has logged 9 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 543 days, and its runs average 504 days.
543
Best Run (days)
1R18 (2007-10-25) → 1R19 (2009-04-20)
★ Double breaker-to-breaker
1R18 → 1R19 → 1R20
All Runs
| 2024-05-22 |
2025-10-12 |
508 days |
1R29 → 1R30 |
| 2022-11-19 |
2024-04-13 |
511 days |
1R28 → 1R29 |
| 2019-11-06 |
2021-04-11 |
522 days |
1R26 → 1R27 |
| 2018-05-10 |
2019-10-13 |
521 days |
1R25 → 1R26 |
| 2015-06-15 |
2016-09-24 |
467 days |
1R23 → 1R24 |
| 2012-05-11 |
2013-09-30 |
507 days |
1R21 → 1R22 |
| 2009-05-22 |
2010-10-02 |
498 days |
1R19 → 1R20 |
| 2007-10-25 |
2009-04-20 |
543 days |
1R18 → 1R19 |
| 2004-11-15 |
2006-02-13 |
455 days |
1R16 → 1R17 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Beaver Valley Nuclear Generating Station.
Beaver Valley Power Station is a two-unit nuclear plant at Shippingport, Beaver County, Pennsylvania, on the Ohio River about 27 miles northwest of Pittsburgh. It is adjacent to the site of the Shippingport Atomic Power Station.
Read more
Construction began on Unit 1 on June 26, 1970, and on Unit 2 on May 3, 1974. Both units use Westinghouse pressurized water reactors. Unit 1 was first connected to the grid on June 14, 1976, and entered commercial operation on October 1, 1976. Unit 2 was connected on August 17, 1987, and entered commercial operation on November 17, 1987. Unit 1 served as the reference design for the Fessenheim plant in France.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Beaver Valley 1 has operated for about 50.1 years and averaged a 90.9% lifetime capacity factor, generating roughly 201.9 TWh of electricity. Its longest unbroken run reached 544 days.
Lifecycle & Tenure
Operating Age: 50.1 Yrs
Build Time: 6.3 Yrs
Lic. Remaining: 9.3 Yrs
Production & Power
Lifetime CF: 90.9%
Efficiency: 31.3%
Generated: 201.9 TWh
Reliability & Outages
Record Run: 544 Days
Refuelings: 18
Avg Startup: 5.4 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Dec 3, 1999 |
Sold |
Duquesne Light |
FirstEnergy |
| Feb 27, 2020 |
Spin-off |
FirstEnergy |
Energy Harbor |
| Mar 1, 2024 |
Sold |
Energy Harbor |
Vistra |
VST
Vistra Corp.
NYSE
$143.38
▼ -3.28 (-2.24%)
Previous Close
146.66
Day's Range
142.20 – 147.82
52-Week Range
132.66 – 200.73
Volume
3,498,474
Operational Excellence Score Subscribers
Beaver Valley 1 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
8 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Beaver Valley 1 has recorded 8 reactor scrams, or emergency shutdowns, since 2011 (3 automatic, 5 manual). On average the unit was back to full power about 20.4 days after each trip.
Recent Events
| 2024-05-19 |
Manual |
MANUAL REACTOR TRIP The following information was provided b... |
|
| 2024-04-13 |
Auto |
EN Revision Imported Date: 4/15/2024 EN Revision Text: AUTOM... |
|
| 2022-06-15 |
Manual |
MANUAL REACTOR TRIP AND AUTOMATIC AUXILIARY FEEDWATER ACTUAT... |
|
| 2019-11-04 |
Manual |
MANUAL REACTOR TRIP DUE TO STEAM DUMP TRANSIENT"At 0535 [EST... |
|
| 2017-11-07 |
Auto |
UNIT 1 AUTOMATIC REACTOR TRIP DUE TO MAIN UNIT GENERATOR OVE... |
|
| 2015-04-15 |
Manual |
MANUAL REACTOR TRIP DUE TO THE LOSS OF A CONDENSATE PUMP "At... |
|
| 2014-01-06 |
Auto |
AUTOMATIC REACTOR TRIP DUE TO MAIN TRANSFORMER FAULT "At 165... |
|
| 2013-11-05 |
Manual |
NOTIFICATION OF UNUSUAL EVENT DUE TO EXPLOSION AND FIRE IN T... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
WESTINGHOUSE ELECTRIC CORPORATION IAEA
Thermal Power:
2900 MWt
Net Capacity:
907 MWe
Gross Capacity:
959 MWe IAEA
Design Capacity:
835 MWe IAEA
Efficiency:
31.3%
Lifetime Output:
285.3 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000334
License #:
DPR-66
License Type:
OL-FP
Const. Permit:
1970-06-26
Construction Start:
1970-06-26 IAEA
Operating Lic:
1976-07-02
First Criticality:
1976-05-10 IAEA
Grid Connection:
1976-06-14 IAEA
Commercial Op:
1976-10-01
License Renewed:
2009-11-05
License Exp:
2036-01-29
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
RFC
— Reliability First Corporation
Census Region:
MAT
— Middle Atlantic
Balancing Authority:
PJM
— PJM Interconnection (ISO/RTO)
Market Structure:
Merchant
— Competitive generator selling into wholesale markets