B2B CHAMPION
1,719 days without a trip
·
3 Career Runs · 1 since last trip
Champion since Nov 14, 2024
Breaker-to-Breaker Runs
3 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Brunswick 2 has logged 3 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 725 days, and its runs average 698 days.
725
Best Run (days)
B2R26 (2023-03-07) → B2R27 (2025-03-01)
★ Double breaker-to-breaker
B2R21 → B2R22 → B2R23
All Runs
| 2023-03-07 |
2025-03-01 |
725 days |
B2R26 → B2R27 |
| 2015-04-05 |
2017-03-18 |
713 days |
B2R22 → B2R23 |
| 2013-05-06 |
2015-02-21 |
656 days |
B2R21 → B2R22 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Brunswick Nuclear Generating Station.
Brunswick Nuclear Generating Station is a two-unit nuclear plant in Smithville Township, Brunswick County, North Carolina, near Southport, about five miles from the Atlantic Ocean. It draws cooling water from the Cape Fear River.
Read more
Construction began on February 7, 1970. The plant has two General Electric BWR-4 boiling water reactors with Mark 1 containment. Unit 2 was first connected to the grid on April 29, 1975, and entered commercial operation on November 3, 1975. Unit 1 was connected on December 4, 1976, and entered commercial operation on March 18, 1977. Both reactors were shut down on September 13, 2018, ahead of Hurricane Florence.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Brunswick 2 has operated for about 51 years and averaged a 90.8% lifetime capacity factor, generating roughly 207.6 TWh of electricity. Its longest unbroken run reached 726 days.
Lifecycle & Tenure
Operating Age: 51 Yrs
Build Time: 5.7 Yrs
Lic. Remaining: 8.2 Yrs
Production & Power
Lifetime CF: 90.8%
Efficiency: 31.9%
Generated: 207.6 TWh
Reliability & Outages
Record Run: 726 Days
Refuelings: 14
Avg Startup: 9.1 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Nov 30, 2000 |
Merger |
Carolina Power & Light |
Progress Energy |
| Jul 2, 2012 |
Merger |
Progress Energy |
Duke Energy |
DUK
Duke Energy Corporation
NYSE
$121.25
▼ -0.08 (-0.07%)
Previous Close
121.33
Day's Range
120.92 – 121.70
52-Week Range
112.40 – 134.49
Volume
1,051,997
Operational Excellence Score Subscribers
Brunswick 2 is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
2 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Brunswick 2 has recorded 2 reactor scrams, or emergency shutdowns, since 2011 (0 automatic, 2 manual). On average the unit was back to full power about 20 days after each trip.
Recent Events
| 2019-03-30 |
Manual |
MANUAL REACTOR SCRAM AND SPECIFIED SYSTEM ACTUATION "At 17:4... |
|
| 2011-11-16 |
Manual |
UNUSUAL EVENT DUE TO DRYWELL LEAKAGE GREATER THAN 10 GPM "On... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
2923 MWt
Net Capacity:
932 MWe
Gross Capacity:
960 MWe IAEA
Design Capacity:
821 MWe IAEA
Efficiency:
31.9%
Lifetime Output:
287.4 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000324
License #:
DPR-62
License Type:
OL-FP
Const. Permit:
1970-02-07
Construction Start:
1970-02-07 IAEA
Operating Lic:
1974-12-27
First Criticality:
1975-03-20 IAEA
Grid Connection:
1975-04-29 IAEA
Commercial Op:
1975-11-03
License Renewed:
2006-06-26
License Exp:
2034-12-27
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
SERC
— SERC Reliability Corporation
Census Region:
SAT
— South Atlantic
Balancing Authority:
CPLE
— Duke Energy Progress East (formerly Carolina Power & Light - East)
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)