Indian Point Energy Center is a three-reactor site at Buchanan, in Westchester County, New York, on the east bank of the Hudson River just south of Peekskill. It lies about 36 miles north of Midtown Manhattan.
Read more
Consolidated Edison began building Unit 1, a Babcock & Wilcox pressurized water reactor, on May 1, 1956. It connected to the grid in September 1962 and was shut down on October 31, 1974, because its emergency core cooling system did not meet requirements. Unit 2 (Westinghouse, construction started October 14, 1966) began operating in 1973 and was shut down in April 2020. Unit 3 (Westinghouse, built by the New York Power Authority, construction started November 1, 1968) began in 1976 and was shut down in April 2021.
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Indian Point 2 has operated for about 45.7 years and averaged a 82.7% lifetime capacity factor, generating roughly 158.9 TWh of electricity. Its longest unbroken run reached 1,853 days.
Lifecycle & Tenure
Operating Age:45.7 Yrs
Build Time:7.8 Yrs
Lic. Remaining:N/A Yrs
Production & Power
Lifetime CF:82.7%
Efficiency:31.4%
Generated:158.9 TWh
Reliability & Outages
Record Run:1,853 Days
Refuelings:9
Avg Startup:7.7 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Indian Point 2 has recorded 10 reactor scrams, or emergency shutdowns, since 2011 (5 automatic, 5 manual). On average the unit was back to full power about 6.9 days after each trip.
10
Total
5
Automatic
5
Manual
6.9
Avg Recovery (days)
Recent Events
2019-03-24
Auto
REACTOR AUTOMATIC TRIP ON TURBINE TRIP "On March 24, 2019, a...
2019-03-15
Auto
AUTOMATIC REACTOR TRIP DUE TO TURBINE GENERATOR TRIP "On Mar...
2018-04-19
Manual
MANUAL REACTOR TRIP DUE TO TURBINE ISSUE "While performing a...
2017-06-26
Auto
MANUAL REACTOR TRIP DUE TO LOSS OF MAIN FEEDPUMP "On June 26...
2016-07-06
Auto
AUTOMATIC REACTOR TRIP WHILE PERFORMING TESTING "On July 6, ...
2015-12-05
Manual
MANUAL REACTOR TRIP INITIATED DUE TO MULTIPLE DROPPED CONTRO...
2013-07-03
Manual
REACTOR TRIP FOLLOWING LOSS OF INSTRUMENT AIR TO MAIN FEEDWA...
2013-02-13
Manual
MANUAL REACTOR TRIP ON LOW STEAM GENERATOR WATER LEVEL "At 1...
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.