Breaker-to-Breaker Runs
3 runs
?
Breaker-to-breaker runs measure continuous operation between refueling outages using a cycle-adjusted threshold (90% of cycle length minus RFO duration). An active streak means the unit has been running continuously since the last refueling with no trips to 0% power.
Monticello has logged 3 breaker-to-breaker runs, continuous stretches from one refueling to the next with no trip to zero power. Its longest ran 705 days, and its runs average 681 days.
705
Best Run (days)
M1R29 (2019-05-14) → M1R30 (2021-04-18)
★ Double breaker-to-breaker
M1R28 → M1R29 → M1R30
All Runs
| 2019-05-14 |
2021-04-18 |
705 days |
M1R29 → M1R30 |
| 2017-05-15 |
2019-04-14 |
699 days |
M1R28 → M1R29 |
| 2005-04-11 |
2007-01-11 |
640 days |
M1R22 → M1R23 |
About This Site
?
Written by NukeWorker from public records: facts that do not change. Operator, status and capacity come from the live data elsewhere on this page. Sources: Wikipedia: Monticello Nuclear Generating Plant.
Monticello Nuclear Generating Plant is on the Mississippi River at Monticello, in Wright County, Minnesota.
Read more
Construction began on June 19, 1967. The plant was built with one General Electric BWR-3 boiling water reactor with a Mark 1 containment. It connected to the grid on March 5, 1971, and entered commercial operation on June 30, 1971. About 50,000 gallons of low-level radioactive water were released into the Mississippi River for repairs in November 1971, and about 1,300 gallons of radioactive water leaked into the river on May 5, 1982.
Facility Statistics
?
Key performance and lifecycle metrics calculated from NRC operational data. Includes operating age, construction timeline, capacity factor, efficiency, generation totals, and reliability records.
Monticello has operated for about 55.3 years and averaged a 87.8% lifetime capacity factor, generating roughly 128.8 TWh of electricity. Its longest unbroken run reached 707 days.
Lifecycle & Tenure
Operating Age: 55.3 Yrs
Build Time: 4 Yrs
Lic. Remaining: 23.8 Yrs
Production & Power
Lifetime CF: 87.8%
Efficiency: 30.8%
Generated: 128.8 TWh
Reliability & Outages
Record Run: 707 Days
Refuelings: 14
Avg Startup: 5.5 Days
Ownership & Construction
?
The utility or company that owns and operates the facility, the architect-engineer responsible for plant design, and the primary construction contractor. Click names to view all facilities by that entity on the map.
Ownership, operation and management history
| Date | Change |
From | To |
| Aug 7, 2000 |
Operator change |
Northern States Power (owner, operated it) |
Nuclear Management Co (operator only) |
| Sep 22, 2008 |
Operator change |
Nuclear Management Co (operator only) |
Xcel Energy (owner, took over operation) |
XEL
Xcel Energy Inc.
NasdaqGS
$78.76
▼ -0.57 (-0.72%)
Previous Close
79.33
Day's Range
78.26 – 79.32
52-Week Range
68.72 – 84.23
Volume
11,754,658
Operational Excellence Score Subscribers
Monticello is rated 0 to 100 on how well it actually runs, scored against every other operating reactor in the US fleet from its own operating record. Subscribers see the score, the three sub-scores behind it, and each of the seven measured inputs.
- This unit's composite score and fleet rank
- Reliability, Efficiency and Discipline sub-scores
- All seven measured inputs, with fleet percentiles
- Rank against comparable units, not just the fleet
- Three-year, five-year and lifetime windows
- Five-year trend, and every other operating US reactor
Scram History
8 events since 2011
?
Automatic and manual reactor scram (emergency shutdown) events reported to the NRC since 2011. Includes event dates, trip type, and average recovery time. Click the title to view the full fleet scram dashboard.
Monticello has recorded 8 reactor scrams, or emergency shutdowns, since 2011 (7 automatic, 1 manual). On average the unit was back to full power about 10 days after each trip.
Recent Events
| 2025-07-28 |
Manual |
MANUAL REACTOR SCRAM The following information was provided ... |
|
| 2025-03-19 |
Auto |
AUTOMATIC REACTOR SCRAM The following information was provid... |
|
| 2024-02-28 |
Auto |
AUTOMATIC REACTOR SCRAM The following information was provid... |
|
| 2023-09-27 |
Auto |
EN Revision Imported Date: 9/28/2023 EN Revision Text: ACTUA... |
|
| 2015-11-23 |
Auto |
REACTOR SCRAM DUE TO A REACTOR RECIRCULATION PUMP LOCKOUT "A... |
|
| 2012-09-25 |
Auto |
AUTOMATIC REACTOR SCRAM DURING MAINTENANCE ON 4160V BUS 12 A... |
|
| 2011-11-19 |
Auto |
AUTOMATIC REACTOR SCRAM WHILE PERFORMING TURBINE BYPASS VALV... |
|
| 2011-10-21 |
Auto |
AUTOMATIC REACTOR SCRAM DUE TO LOCKOUT OF AUXILIARY POWER TR... |
|
Technical Specs
?
Reactor design specifications including type (PWR/BWR), containment design, nuclear steam supply system manufacturer, thermal and electrical power ratings, and current operational status.
Turbine Supplier:
GENERAL ELECTRIC CO. IAEA
Thermal Power:
2004 MWt
Net Capacity:
617 MWe
Gross Capacity:
691 MWe IAEA
Design Capacity:
545 MWe IAEA
Efficiency:
30.8%
Lifetime Output:
225.9 TWh through 2025 IAEA
Licensing
?
NRC licensing history including docket number, license type and number, construction permit date, operating license issuance, commercial operation date, license renewal, and expiration date.
Docket #:
05000263
License #:
DPR-22
License Type:
OL-FP
Const. Permit:
1967-06-19
Construction Start:
1967-06-19 IAEA
Operating Lic:
1970-09-08
First Criticality:
1970-12-10 IAEA
Grid Connection:
1971-03-05 IAEA
Commercial Op:
1971-06-30
License Renewed:
2024-12-30
License Exp:
2050-09-08
Market & Region
?
EIA market and grid-region classifications: NERC reliability region, U.S. Census region, balancing authority responsible for grid operations, and whether the unit operates as a rate-regulated utility or a competitive merchant generator. Hover any value for the full name.
NERC Region:
MRO
— Midwest Reliability Organization
Census Region:
WNC
— West North Central
Balancing Authority:
MISO
— Midcontinent Independent System Operator (ISO/RTO)
Market Structure:
Regulated
— Rate-regulated utility (cost-of-service pricing)